데이터셋 상세
호주
Hilltops Council - Boorowa Floodplain Risk Management Study and Plan Outputs
Hilltops Council (Council) commissioned the Floodplain Risk Management Study and Plan for the township of Boorowa. The overall objectives of the Floodplain Risk Management Study (FRMS) were to assess the impacts of flooding, review existing Council policies as they relate to development of land in flood liable areas, consider options for the management of flood affected land and to develop a Floodplain Risk Management Plan (FRMP) which: i) Proposes modifications to existing Council policies to ensure that the development of flood affected land is undertaken so as to be compatible with the flood hazard and risk. ii) Proposes Flood Planning Levels for the various land uses in the floodplain. iii) Sets out the recommended program of works and measures aimed at reducing over time, the social, environmental and economic impacts of flooding. iv) Provides a program for implementation of the proposed works and measures. The FRMS focuses on Main Stream Flooding from the Boorowa River, Ryans Creek and Ryans Tributary, as well as two major un-named tributaries, Minor Tributary Flooding caused by high flows in the minor un-named tributaries which drain to the aforementioned watercourses, and Major Overland Flow areas which occur in the urbanised parts of Boorowa and its immediate surrounds.
데이터 정보
연관 데이터
Hilltops Council - Boorowa Floodplain Risk Management Study and Plan - Community Consultation
공공데이터포털
Hilltops Council (Council) commissioned the Floodplain Risk Management Study and Plan for the township of Boorowa. The overall objectives of the Floodplain Risk Management Study (FRMS) were to assess the impacts of flooding, review existing Council policies as they relate to development of land in flood liable areas, consider options for the management of flood affected land and to develop a Floodplain Risk Management Plan (FRMP) which: i) Proposes modifications to existing Council policies to ensure that the development of flood affected land is undertaken so as to be compatible with the flood hazard and risk. ii) Proposes Flood Planning Levels for the various land uses in the floodplain. iii) Sets out the recommended program of works and measures aimed at reducing over time, the social, environmental and economic impacts of flooding. iv) Provides a program for implementation of the proposed works and measures. The FRMS focuses on Main Stream Flooding from the Boorowa River, Ryans Creek and Ryans Tributary, as well as two major un-named tributaries, Minor Tributary Flooding caused by high flows in the minor un-named tributaries which drain to the aforementioned watercourses, and Major Overland Flow areas which occur in the urbanised parts of Boorowa and its immediate surrounds.
Hilltops Council - Boorowa Floodplain Risk Management Study and Plan - Spatial layers
공공데이터포털
Hilltops Council (Council) commissioned the Floodplain Risk Management Study and Plan for the township of Boorowa. The overall objectives of the Floodplain Risk Management Study (FRMS) were to assess the impacts of flooding, review existing Council policies as they relate to development of land in flood liable areas, consider options for the management of flood affected land and to develop a Floodplain Risk Management Plan (FRMP) which: i) Proposes modifications to existing Council policies to ensure that the development of flood affected land is undertaken so as to be compatible with the flood hazard and risk. ii) Proposes Flood Planning Levels for the various land uses in the floodplain. iii) Sets out the recommended program of works and measures aimed at reducing over time, the social, environmental and economic impacts of flooding. iv) Provides a program for implementation of the proposed works and measures. The FRMS focuses on Main Stream Flooding from the Boorowa River, Ryans Creek and Ryans Tributary, as well as two major un-named tributaries, Minor Tributary Flooding caused by high flows in the minor un-named tributaries which drain to the aforementioned watercourses, and Major Overland Flow areas which occur in the urbanised parts of Boorowa and its immediate surrounds.
Hilltops Council - Boorowa Flood Study Report
공공데이터포털
The study objective was to define the nature of both main stream flooding and major overland flow at Boorowa for flood frequencies ranging between 20 and 0.2 per cent Annual Exceedance Probability (AEP), as well as for the Probable Maximum Flood (PMF). The indicative extent of land which is affected by both main stream flooding and major overland flow at Boorowa. The Flood Study is the source of present day flooding conditions and will be used as the basis for preparing the future Floodplain Risk Management Study and Draft Plan (FRMS&DP) for Boorowa.
Central Coast Council - Porters Creek Floodplain Risk Management Study
공공데이터포털
The overall objective of this study is to develop a Floodplain Risk Management Study where management issues are assessed, management options are investigated and recommendations are made. Thereafter a Floodplain Risk Management Plan detailing how flood prone land within the study area is to be managed can be completed. The objectives of the Flood Risk Management Study are to:,
Cessnock City Council - Wollombi Floodplain Risk Management Study and Plan-Report
공공데이터포털
The Wollombi Flood Study Review and Model Upgrade completed in 2010 represents the initial stage in the floodplain management process and establishes the basis for the current floodplain risk management study. The objectives of the Wollombi Floodplain Risk Management Study are to:  Identify and assess measures for the mitigation of existing flood risk;  Identify and assess planning and development controls to reduce future flood risks; and  Present a recommended floodplain management plan that outlines the best possible measures to reduce flood damages in the Wollombi locality. This report documents the Floodplain Risk Management Study and presents a recommended Floodplain Risk Management Plan for the Wollombi Village.
Hilltops Council - MURRUMBURRAH FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN 2019-2020
공공데이터포털
The Murrumburrah Flood Study (Reference 1), the first stage of the management process was completed in December 2019. The Murrumburrah Floodplain Risk Management Study and Plan constitutes the second and third stage of the management process for the catchment. This study has been prepared by WMAwater for Hilltops Council and was undertaken to provide the basis for future management of flood liable lands within the study area. This report has been prepared with financial assistance from the NSW Government through its Floodplain Management Program. This document does not necessarily represent the opinions of the NSW Government or the Department of Planning, Industry and the Environment. The Murrumburrah Flood Study provided information about existing flood risk in the Currawong Creek catchment, which is also known locally as Murrimboola Creek. Flood modelling tools were developed In the Flood Study that can be used by Council for decision-making about land-use planning, and in future studies such as the current Murrumburrah Floodplain Risk Management Study and Plan to assess the effectiveness of potential measures to reduce flood risk.
Georges River Council - Beverley Park Overland Flow Risk Management Study & Plan
공공데이터포털
A Floodplain Risk Management Study and Plan (FRMS&P) for the Beverley Park catchment has been prepared by Cardno Lawson Treloar for Kogarah Council. The FRMS&P identify and examine options for the management of flooding within the Beverley Park catchment floodplain and is prepared in accordance with the NSW Government Floodplain Development Manual (2005). A locality plan can be found in Figure 1.1. The outline of the study area can be found in Figure 1.2. Study Context This study consists of the two stages of the multiple stages of the Floodplain Management process which includes:,
Wingecarribee Shire Council - Burradoo BU2 Catchment Assessment Study Stage 1 Flood Study Report
공공데이터포털
Objectives The objective of this Study is to define the nature of the existing flood behaviour in the Burradoo BU2 catchment. To achieve the objective, the following tasks were undertaken:,
Shoalhaven City Council - Burrill Lake Floodplain Risk Management Study and Plan
공공데이터포털
This report documents the Burrill Lake Floodplain Risk Management Study and Plan which investigates and presents a flood risk management strategy for the catchment. The study identifies the existing flooding characteristics and canvasses various measures to mitigate the effects of flooding. The end product is the Floodplain Management Plan, which describes how flood liable lands within the Burrill Lake catchment are to be managed in the future.
Randwick City Council - Green Square, West Kensington Floodplain Risk Management Study
공공데이터포털
FLOODPLAIN RISK MANAGEMENT STUDY The specific aims of this study are to:,