데이터셋 상세
호주
Shoalhaven City Council - Burrill Lake Catchment Flood Study
This report documents the Burrill Lake Catchment Flood Study which defines existing flood behaviour and establishes the basis for floodplain management activities in the future.
데이터 정보
연관 데이터
Shoalhaven City Council - Currarong Creek Flood Study - Report (Final)
공공데이터포털
Currarong Creek flood study report
Shoalhaven City Council - St Georges Basin Flood Study - Report
공공데이터포털
Final Report
Shoalhaven City Council - St Georges Basin Flood Study - Report
공공데이터포털
Final Report
Shoalhaven City Council - Final Reports
공공데이터포털
The Flood Study, Floodplain Risk Management Study and Floodplain Risk Management Plan documents
Bayside Council - Floodplain Management Study Spring Street Drain, Muddy Creek and Scarborough Ponds - Volume 1
공공데이터포털
Objective This Floodplain Management Study defines the nature and extent of the flood hazard in the three catchments. It also identifies and assesses strategies and measures aimed at reducing the impact of flooding on both existing and future development, and measures to prevent future development from making flooding worse. The results of this Floodplain Management Study are being used to prepare a Floodplain Management Plan (FPMP). The objective of the FPMP is to establish a cost-effective floodplain management strategy for the area and to recommend a programme for implementation of the Plan. The Study Brief is attached as Appendix A. What is in the Study The Floodplain Management Study and Plan will not totally eliminate flooding. Flooding is a natural phenomenon which cannot be fully controlled by human works. In fact, excessive artificial controls are likely to be very costly and to have adverse environmental effects. Therefore the Floodplain Management Study and Plan aim to provide a package of best management practices which give a balance between reducing flood hazard and flood damages, allowing appropriate development, and protecting and enhancing the environment of the floodplain. This Report has been divided into the following sections: Section 1: Introduction (page 1) Establishes the context and basis for the plan. Section 2: Background (page 5) Describes the study process, including previous studies, and the background technical information which is available. It includes a review of the previous Muddy Creek Flood Studies. Section 3: Existing Flood Behaviour (page 15) Summarises the available data and modelling results concerning flood behaviour. Section 4: Social and Economic Impacts of Flooding (page 23) Examines the potential flood damages and other social and economic effects of flooding for a range of flood events, including an extreme flood. Section 5: Choosing the Designated Flood (page 28) Discusses the issued to be considered by Council in choosing a designated flood for Rockdale, and recommends that the 1% AEP flood be adopted. Section 6: Available Floodplain Management Options (page 35) Describes in broad terms the range of flood mitigation and other management works and other measures available to address the existing, future and residual flooding problems in the study area. Sections 7, 8 and 9: Options for Management Areas (page 48) These three sections describe in detail, for the Muddy Creek, Spring St Drain and Scarborough Ponds catchments respectively, the feasible options and their likely benefits and costs. Section 10: Assessment of Management Options (page 86) Reviews the financial aspects and the justification for the proposed management measures, identifies priorities and possible sources of funding. These issues will be further addressed in the future Floodplain Management Plan. Section 11: References (page 90) Technical detail which supports the main report is provided in the Appendices, in Volume 2.
Shoalhaven City Council - 1 Willinga Lk FRMS - Final Reports
공공데이터포털
The reporting for the Willinga Lake Flood Study and Floodplain Risk Management Study and Plan is separated into three report volumes as follows: ▪ Volume 1: Flood Study Report This report details the development of flood model development, calibration, design flood estimation and mapping for the study area. ▪ Volume 2: Floodplain Risk Management Study & Plan (FRMS&P) This report details investigations into flood affectation, risk and impacts, the assessment of potential management measures, and the selection of recommended management measures to form a Floodplain Risk Management Plan. ▪ Volume 3: Flood Mapping Compendium.
Narrabri Shire Council - Wee Waa Levee Flood Investigation
공공데이터포털
This study investigates the hydraulic effectiveness of the current levee, assess the need for future improvements and also attempt to establish the flood overtopping levels of the levee, for the benefit of emergency services.
Shoalhaven City Council - Lower Shoalhaven River Flood Study - Historical Rainfall Water Level
공공데이터포털
Rainfall, Pluviographic, gauged water level and tide data
Lake Macquarie City Council - Stony Creek Flood Study
공공데이터포털
The objectives of the Flood Study are to: • Identify all the flood-related data by searching all relevant data sources. • Determine the likely extent and nature of flooding and identify potential hydraulic controls by carrying out detailed site visits of the study area. • Define existing catchment condition flood behaviour for mainstream flooding in the catchment with due consideration to the impact of Lake Macquarie levels on flooding characteristics. • Define design flood levels, velocities and flow distributions for the catchment. • Define the extent of flooding for the 200 year, 100 year, 20 year, 10 year and 5 year ARI floods and Probable Maximum Flood (PMF) for the catchment. • Define Provisional Flood Hazard for the flood-affected areas. • Define the Hydraulic Categories for the flood-affected areas. Two numerical modelling tools were developed: • A hydrologic model to convert rainfall on the catchment into runoff. The hydrologic model combines rainfall information with local catchment characteristics to estimate runoff hydrographs. • A hydraulic model to convert runoff hydrographs into water levels and velocities throughout the study area. The model simulates the hydraulic behaviour of the water within the study area by accounting for flow in the major channels as well as all the potential overland flowpaths, which develop when the capacity of the channels is exceeded. It relies on boundary conditions, which include the runoff hydrographs produced by the hydrologic model and the appropriate downstream boundary level from Lake Macquarie.
Lake Macquarie City Council - North Creek Warners Bay Flood Study January 2025 Final Report - All appendices & figures included
공공데이터포털
This document constitutes the first and second stages of the management process for the North Creek catchment. It presents a compilation of the data collected and has defined flood behaviour and flood risk for the catchment area. This study was commissioned under the 2005 NSW Floodplain Development Manual (Reference 1), however, it is recognised that the 2023 Flood Risk Management Manual (Reference 2) was gazetted shortly after the project commenced. While the study was undertaken in accordance with the 2005 manual, there are elements that are consistent to both the 2005 and 2023 manuals. Where appropriate, the 2023 manual is referenced where project methodology or outputs are consistent with the new 2023 manual