데이터셋 상세
호주
Northern Beaches Council - Manly to Seaforth Data Description
Cardno was commissioned by Northern Beaches Council to undertake the Manly to Seaforth Flood Study for urban catchments, which comprises the suburbs of Clontarf and Balgowlah Heights and parts of Seaforth, Balgowlah, Fairlight, and Manly. A number of modelling scenarios were assessed to determine the flood behaviour as a part of the study: - Calibration events – February 2010, June 2013 and October 2013. - Design events – 20%, 10%, 2%, 1%, 0.5% AEP and PMF. - Sensitivity events for varied model parameters, blockage, and climate change This document provides the location and description of these data files.
데이터 정보
연관 데이터
Northern Beaches Council - Manly Lagoon Floodplain Risk Management Study and Plan
공공데이터포털
This report comprises an overview of the work that has been undertaken by WMAwater on the Manly Lagoon Floodplain Risk Management Study and Plan. It builds on prior stage reports and, in accordance with the Brief, it additionally includes a discussion of: • hydraulic and hazard categorisation; • future development scenarios; • review of climate change; • flood damages assessment; and • emergency management.
Northern Beaches Council - Narrabeen Lagoon Floodplain Risk Management Study and Plan 2019
공공데이터포털
Narrabeen Lagoon Floodplain Risk Management Study and Plan 2019 - Reports
Central Coast Council - Northern Lakes Floodplain Risk Management Study and Plan - Processed Hydraulic Results (Public)
공공데이터포털
Processed results include: depth, level, velocity, VxD, hazard, hydraulic categories, FPA, extents, emergency response categories, and climate change
Central Coast Council - Cockrone Lagoon Flood Study
공공데이터포털
Flood study centres around the opening of Cockrone Lagoon to the ocean when the water level exceeds the let-out-level of RL2.476m AHD. The policy is aimed at minimising the flooding of properties adjacent to the lagoon. The investigation process used in this flood study was: collection of available data assessment of available data overview of lagoon behaviour assessment of coastal processes hydrologic modelling of the catchment to determine flood inflows, and hydraulic modelling of the lagoon to assess flood levels from flood inflows
Northern Beaches Council - Careel Creek Floodplain Risk Management Plan - Hydraulic Model (MIKE-11)
공공데이터포털
Hydraulic Model (MIKE-11) - Inputs and Outputs
Central Coast Council - Northern Lakes Flood Study - Hydraulic Model
공공데이터포털
Data contains: Model files for design runs; Model files for sensitivity runs; Model files for blockage assessment;
NSW Department of Climate Change, Energy, the Environment and Water - Post 2022 Event Flood Behaviour Analysis - Brunswick River Report
공공데이터포털
The Post 2022 Event Flood Behaviour Analysis - Brunswick River aims to understand the areas impacted by the recent 2022 flood event and determin the current approved flood model's ability to replicate the 2022 event. The study area includes the townships of Mullumbimby, Brunswick Heads, Ocean Shores, and villages of New Brighton, South Golden Beach and Billinudgel. The study area covers an area of approximately 230 square kilometres, and includes diverse environments, generally comprising of dense vegetation in the hinterlands and coastal villages to the east of the catchment. The Post 2022 Event Flood Behaviour Analysis of the Brunswick River involved a review of the hydrological and hydraulic models, and IFD estimates. Flood Frequency Analysis and Regional Flood Frequency Estimation methods were undertaken to assess the model perfomance. A damage assessment was undertaken to determine the cost of damage and the degree of disruption to the community caused duing flooding event.
Hilltops Council - Boorowa Floodplain Risk Management Study and Plan - Spatial layers
공공데이터포털
Hilltops Council (Council) commissioned the Floodplain Risk Management Study and Plan for the township of Boorowa. The overall objectives of the Floodplain Risk Management Study (FRMS) were to assess the impacts of flooding, review existing Council policies as they relate to development of land in flood liable areas, consider options for the management of flood affected land and to develop a Floodplain Risk Management Plan (FRMP) which: i) Proposes modifications to existing Council policies to ensure that the development of flood affected land is undertaken so as to be compatible with the flood hazard and risk. ii) Proposes Flood Planning Levels for the various land uses in the floodplain. iii) Sets out the recommended program of works and measures aimed at reducing over time, the social, environmental and economic impacts of flooding. iv) Provides a program for implementation of the proposed works and measures. The FRMS focuses on Main Stream Flooding from the Boorowa River, Ryans Creek and Ryans Tributary, as well as two major un-named tributaries, Minor Tributary Flooding caused by high flows in the minor un-named tributaries which drain to the aforementioned watercourses, and Major Overland Flow areas which occur in the urbanised parts of Boorowa and its immediate surrounds.
Hilltops Council - Boorowa Floodplain Risk Management Study and Plan - Community Consultation
공공데이터포털
Hilltops Council (Council) commissioned the Floodplain Risk Management Study and Plan for the township of Boorowa. The overall objectives of the Floodplain Risk Management Study (FRMS) were to assess the impacts of flooding, review existing Council policies as they relate to development of land in flood liable areas, consider options for the management of flood affected land and to develop a Floodplain Risk Management Plan (FRMP) which: i) Proposes modifications to existing Council policies to ensure that the development of flood affected land is undertaken so as to be compatible with the flood hazard and risk. ii) Proposes Flood Planning Levels for the various land uses in the floodplain. iii) Sets out the recommended program of works and measures aimed at reducing over time, the social, environmental and economic impacts of flooding. iv) Provides a program for implementation of the proposed works and measures. The FRMS focuses on Main Stream Flooding from the Boorowa River, Ryans Creek and Ryans Tributary, as well as two major un-named tributaries, Minor Tributary Flooding caused by high flows in the minor un-named tributaries which drain to the aforementioned watercourses, and Major Overland Flow areas which occur in the urbanised parts of Boorowa and its immediate surrounds.