데이터셋 상세
호주
Tweed Shire Council - Tweed Valley Floodplain Risk Management Study - Report
Summary of recommended Floodplain Risk Management options is contained in the report. It considered Existing Flood Risk, Flood Modification Measures, Response Modification Measures, Property Modification Measures, Future Flood Risk, Climate Change, and Planning and Future Development. These measures are summarised in an options assessment matrix which highlights quantifiable impacts, costs and benefits, but also intangible considerations such as social and environmental factors. The matrix can be used to compare options and inform the selection of measures to be adopted for implementation. Measures are also marked on Figure ES-1 in report where possible / appropriate. A number of other measures were considered during the study. Measures which were not carried over to this document were found to be not feasible or practicable based on hydraulic assessments and advice from members of the Floodplain Management Technical Sub-committee.
데이터 정보
연관 데이터
Tweed Shire Council - Tweed Valley Floodplain Risk Management Plan 2005 (Part 1 & 2) - Report
공공데이터포털
Part 1- Establish Appropriate Flood Planning Levels for Residential Development Part 2- Planning Controls for High Flow Areas
Tweed Shire Council - Tweed Coastal Creeks Floodplain Risk Management Study and Plan Reports
공공데이터포털
Floodplain Risk Management Study and Plan and discussion papers
Tweed Shire Council - Tweed Valley Floodplain Risk Management Study - Report and Figures
공공데이터포털
PDF copies of final report and figures
Tweed Shire Council - Tweed Valley - Floodplain Risk Management Plan (Draft) - Report
공공데이터포털
Complete report
Tweed Shire Council - Tweed Valley Floodplain Risk Management Study (Draft) - Report
공공데이터포털
Complete report
Tweed Shire Council - Tweed Coastal Creeks Hydraulic Output Files
공공데이터포털
Tweed Coastal Creeks Hydraulic Results files - Depth, water level, velocity, hazard Base case Design events - 1 in 100 year AEP, PMF, Climate Change. Cumulative Development - 1 in 100 year AEP
Tweed Shire Council - Tweed Valley Floodplain Risk Management Study - WBNM and TUFLOW Output Files
공공데이터포털
WBNM and TUFLOW model output files for calibration and design flood simulations. Not suitable for inclusion directly in GIS
Cabonne Shire Council - Mol FRMS&P Hydraulic Model Input.zip
공공데이터포털
Molong Flood Risk Management Study and Plan - Hydraulic Model Input Files Contains hydraulic model for future infill development conditions and the potential flood mitigation measures. Refer Molong Flood Study for hydrologic model for present day conditions.