WBNM hydrologic model & results. Appropriateness of 'total' flood flows from any location within this model requires careful consideration by the user, particularly due to presence of numerous flow diversions and the occurrence of cross-catchment flows. See READ ME document.
데이터 정보
연관 데이터
Wollongong City Council - Review of Towradgi Creek Flood Study - Final Report
공공데이터포털
Final report for the Review of Towradgi Creek Flood Study. The report covers the data collection process, community consultation, development of computer models, establishment of design flood behaviour and flood mapping.
Wollongong City Council - Towradgi Creek Flood Study - tuflow wbnm model
공공데이터포털
wbnm and tuflow model
Wollongong City Council - Review of the Brooks Creek Flood Study
공공데이터포털
Final Flood Study and appendices.
Wollongong City Council - Mullet and Brooks Creeks Floodplain Risk Management Study & Plan
공공데이터포털
Report only. See also Mullet Creek, West Dapto Extension of Flood Model - Hydrologic and Hydraulic Modelling Report.
Wollongong City Council - Mullet Creek, West Dapto Extension of Flood Model - Hydrologic and Hydraulic Modelling Report
공공데이터포털
An extension to the Mullet and Brooks Creeks Floodplain Risk Management Study & Plan. Hydrologic and hydraulic report.
Wollongong City Council - Hydrology
공공데이터포털
WBNM
Griffith City Council - Lake Wyangan Flood Study
공공데이터포털
Conclusions The objective of the study was to undertake a detailed flood study of the Lake Wyangan catchment and establish models as necessary for design flood level prediction. Through the undertaking of the flood study it has been found that during flood events the majority of the catchment runoff flows to Tharbogang Swamp rather than Lake Wyangan, as had previously been assumed. Historically there has been little response of Lake Wyangan water levels to rainfall events within the catchment, with only the March 1989 event producing a significant response. The limited response in Lake Wyangan is due to a number of factors: It has a relatively small catchment area of around 100km2, including diverted catchment runoff through the Lake View Drain (Lake Wyangan’s natural catchment is around 75km2); The calibration process found the catchment to indicate a high initial rainfall loss for the events considered. A large amount of rainfall (>60mm) is required before any catchment runoff is generated and a response in the lake can be observed; and A proportion of the catchment runoff volume is retained in temporary flood storages in the catchment, rather than further contributing to the flood storage in the lake. Being a volume-driven closed-catchment system with no natural outlet, flood levels in Lake Wyangan and Tharbogang Swamp are directly related to the catchment runoff volume generated by any given flood event. The high rainfall losses generate relatively small effective rainfall depths and the flood levels are therefore highly sensitive to changes in the adopted initial loss value. The calibration process found an initial loss value of around 60mm to be appropriate for the events considered. However, due to the characteristics of the available design rainfall temporal pattern, this loss value was reduced for design purposes. Tharbogang Swamp has a much larger catchment area than Lake Wyangan and therefore shows a much greater flood response. Unfortunately there has been no history of flood level recording in Tharbogang Swamp to compare to the modelled flood response. The study also identified a number of local overland flow paths which impact of the planned development areas of Council’s Growth Strategy 2030. It is important that these flow paths are taken into consideration during the stages of development planning. The flood study will form the basis for the subsequent floodplain risk management activities, being the next stage of the floodplain risk management process. The key locations to consider during this process have been identified as: Locations where there is potential for cross-catchment flow transfer from the Tharbogang Swamp catchment into Lake Wyangan (potential changes to the existing flow distribution may result from future on-ground works in these localities) ; and Locations where the floodways occur within the proposed development areas of the Giffith Growth Strategy 2030.
Wollongong City Council - TOWRADGI CREEK FLOOD STUDY - Volume 1 & 2
공공데이터포털
Volume 1 & 2 of Report
Wollongong City Council - Towradgi Creek Flood Study, Floodplain Risk Management Study and Plan - Final Reports
공공데이터포털
Final Flood Study, Floodplain Risk Management Study and Plan reports adopted by Wollongong City Council on 26 June 2023.
Wollongong City Council - Mullet Creek Flood Model Update - Models and Results Files
공공데이터포털
The flood models and results files in ascii format are attached. The results include flood levels, depths, velocities and provision hazard for the unblocked and 2016 blockage policy scenarios. The flood modelling was completed using Australian Rainfall and Runoff 1987,1999.