데이터셋 상세
호주
Environmental Impact Statement. Proposed Coal Preparation Plant and Rejects Disposal Area for the Tahmoor Colliery (SJJT0404300B-0S) (Feb. 1976).
Environmental Impact Statement. Proposed Coal Preparation Plant and Rejects Disposal Area for the Tahmoor Colliery (SJJT0404300B-0S) (Feb. 1976).
데이터 정보
연관 데이터
Environmental impact statement for coal washery reject emplacement in the southern gully on part portion 151, Russell Vale, NSW for Bellambi Coal Company Pty Ltd /
공공데이터포털
EIS: Environmental impact statement for coal washery reject emplacement in the southern gully on part portion 151, Russell Vale, NSW for Bellambi Coal Company Pty Ltd /
Drayton Coal Mine : mine development proposal
공공데이터포털
Environmental Impact Statement: Drayton Coal Mine : mine development proposal
Research study in relation to a proposed coal rejects/industrial waste emplacement at Wongawilli.
공공데이터포털
Environmental Impact Statement: Research study in relation to a proposed coal rejects/industrial waste emplacement at Wongawilli.
R. W. Miller & Company Pty. Ltd : application to the State Pollution Control Commission to modify the existing coal handling and preparation facilities at Ayrfield no. 3 Colliery : details of proposed environmental safeguards
공공데이터포털
Environmental Impact Statement: R. W. Miller & Company Pty. Ltd : application to the State Pollution Control Commission to modify the existing coal handling and preparation facilities at Ayrfield no. 3 Colliery : details of proposed environmental safeguards
Report on proposed coal refuse emplacement area : Avon Colliery, Avon, N.S.W. for Austen & Butta Limited
공공데이터포털
Environmental Impact Statement: Report on proposed coal refuse emplacement area : Avon Colliery, Avon, N.S.W. for Austen & Butta Limited
Environmental impact statement for Stage 2A and 2B, coal washery reject emplacement in the southern gully, on part of land in D.P. 63693 and lots 1-3, D.P.225021, Parish of Woonona, County of Camden, Russell Vale, N.S.W., for the Bellambi Coal Company Pty. Limited
공공데이터포털
v. 1. Statement -- v. 2. Appendices.
Environmental impact statement for upgrading the surface facilities at Wyee State Coal Mine /
공공데이터포털
This statement examines the environmental impacts associated with the proposed construction of a 700 tph jig washing plant at Wyee State Coal Mine in Lake Macquarie, NSW.
Proposed Millar Coal Mine at Oakdale, NSW. Environmental Impact Statement (SJJT0404271N-30) (June. 1989).
공공데이터포털
Proposed Millar Coal Mine at Oakdale, NSW. Environmental Impact Statement (SJJT0404271N-30) (June. 1989).
An environmental impact statement for the proposed development of a coal salvage operation by strip mining methods on an existing deep coal mine at Buttai, N.S.W.
공공데이터포털
EIS: An environmental impact statement for the proposed development of a coal salvage operation by strip mining methods on an existing deep coal mine at Buttai, N.S.W.
Statement of environmental effects for the modification of the Dartbrook Coal Mine Development Consent (Water Disposal System) 1
공공데이터포털
Statement of environmental effects for the modification of the Dartbrook Coal Mine Development Consent (Water Disposal System)_1