데이터셋 상세
호주
Hydrologic Modelling of Connectivity Expert Panel Recommendations 2025–Scenario 4–Connectivity EWA–Dam Inflow Trigger
The Panel recommended that the Gwydir, Namoi and NSW Border Rivers regulated water sharing plans should include a ‘connectivity’ environmental water allowance (EWA) to provide pulses as needed for water quality and other environmental outcomes during dry times. Replenishment releases triggered by the dam inflows falling below the 75th percentile on average over 30 days. Up to two large replenishment releases of 20 GL made each year in each valley triggered by low inflows into storage dams. Release triggered on 31 October and 28 February each year if the inflows to the valley storage dams are less than the 75th percentile. Releases are made to achieve at least a week of flows at Bourke with peak flows above 972 ML/d for up to 10 days and at least 30 GL total event volume. A connectivity environmental water allowance was not considered for the regulated Macquarie River as it empties into the Macquarie Marshes rather than the Barwon-Darling. Note: See Analysis of the Connectivity Expert Panel Recommendations: Hydrologic modelling assessment.pdf (attached) for more details. Note: If you would like to ask a question, make any suggestions, or tell us how you are using this dataset, please visit the NSW Water Hub which has an online forum you can join.
연관 데이터
Hydrologic Modelling of Connectivity Expert Panel Recommendations 2025–Scenario 6–Combination
공공데이터포털
Combination of the extended resumption of flow rule inclusive of additional trigger sites, end of system flow target translucency releases and connectivity environmental water allowance Bourke flow trigger. Note: See Analysis of the Connectivity Expert Panel Recommendations: Hydrologic modelling assessment.pdf (attached) for more details. Note: If you would like to ask a question, make any suggestions, or tell us how you are using this dataset, please visit the NSW Water Hub which has an online forum you can join.
Hydrologic Modelling of Connectivity Expert Panel Recommendations 2025–Scenario 2–End of System–Translucency
공공데이터포털
Set an end of system flow target (equivalent to the bottom of baseflow) in regulated valleys (Gwydir, Namoi and Border Rivers) to protect baseflows to enable baseflow targets in the Barwon-Darling to be achieved in non-dry times. The end of system flow achieved through limitations on supplementary and floodplain harvesting access in the first instance and releasing a proportion of daily inflows to the dams(s) in each valley to meet the end of system flow target. This approach only makes releases each day if there is sufficient inflow to the storages over the preceding 24 hours and does not require reserves to be set aside. Releases not made in periods where the rolling 30-day average dam inflows fall below the 75th percentile (the dry inflow trigger). The Panel has not included a recommendation for an end of system flow rule for the regulated Macquarie-Cudgegong as the end of the system flows discharge into the Macquarie Marshes. Note: See Analysis of the Connectivity Expert Panel Recommendations: Hydrologic modelling assessment.pdf (attached) for more details. Note: If you would like to ask a question, make any suggestions, or tell us how you are using this dataset, please visit the NSW Water Hub which has an online forum you can join.
Hydrologic Modelling of Connectivity Expert Panel Recommendations 2025–Scenario 3–Extended Resumption of Flow
공공데이터포털
Flow rates for imposing restrictions have been set at below baseflow for 90 consecutive days at trigger sites, flow rates for lifting restrictions have been set at the lower small fresh threshold for restriction trigger sites; flow rates must exceed the small fresh threshold for 14 days at restriction trigger sites for lifting restrictions. Supplementary and floodplain harvesting has been restricted in the regulated NSW Border Rivers, Namoi, Gwydir and Macquarie River systems when the closest downstream section in the Barwon –Darling is restricted. The 30 GL cumulative flow trigger at Bourke for lifting restrictions has been removed. Three additional trigger locations included as recommended by Panel: Mungindi, Collarenebri and Louth. Note: See Analysis of the Connectivity Expert Panel Recommendations: Hydrologic modelling assessment.pdf (attached) for more details. Note: If you would like to ask a question, make any suggestions, or tell us how you are using this dataset, please visit the NSW Water Hub which has an online forum you can join.
Hydrologic Modelling for Connectivity Expert Panel 2024
공공데이터포털
This time series hydrologic modelling was done at the direction of the Connectivity Expert Panel. The panel used the modelling data to inform the proposed protection of base flow and resumption of flow targets presented in Connectivity Expert Panel Final Report 2024. The Connectivity Expert Panel was convened by the Minister for Water to provide advice on the adequacy and potential improvements to rules in the NSW Northern Basin water sharing plans that might materially impact on hydrological connectivity. The Panel was asked to consider the adequacy of current and proposed targets and triggers for restricting supplementary and floodplain harvesting, as well as A, B and C class licences in the Barwon-Darling. Note: If you would like to ask a question, make any suggestions, or tell us how you are using this dataset, please visit the NSW Water Hub which has an online forum you can join.
환경부 국립환경과학원 수질오염사고 시나리오 모의조건
공공데이터포털
수질오염사고대응시스템 모의조건 데이터(발생일시, 수계명, 지점 좌표, 유출량, 단위, 물질명, 오염물질코드 등)
기후에너지환경부 한강홍수통제소 홍수예보 댐수위저수량곡선식
공공데이터포털
한강홍수통제소에서 댐수위저수량을 구하기 위해 사용하는 곡선식입니다. 예보유역 명, 적용 시작/종료 일자, 일련번호, 관계식 등 데이터를 제공합니다.
Water Modelling-Modelled Data-No Plan Environmental Water (No PEW) - Gwydir
공공데이터포털
To construct a high-level evaluation scenario for the Water Sharing Plan (the Plan) for the Gwydir Regulated River Water Source all account-based Plan Environmental Water (PEW) rules have been removed from the Current Conditions model. Specifically, it included the following PEW rules: Environmental Water Allowance (EWA) stipulated in Cause 64 of the Plan Protection of the minimum (3T) inflow rule stipulated in Clause 61 of the Plan 50:50 sharing of Supplementary water events stipulated in Clause 48 of the Plan The flow at the following key sites within the river system has been considered in the evaluation analysis: 1) 416052_GilGil@Galloway 2) 418001_Gwydir@Pallamallawa 3) 418002_ Mehi@Moree 4) 418004_Gwydir@Yarraman 5) 418013_Gwydir@Gravesend 6) 418037_Mehi@DSCombadello 7) 418048_Moomin@Combadello 8) 418049_Mallowa@Regulator 9) 418052_Carole@Garah 10) 418055_Mehi@Collarenebri 11) 418063_Gwydir@DSTyreel 12) 418066_Gwydir@Millewa 13) 418074_Gingham@Teralba 14) 418076_Gingham@Tillaloo 15) 418078_Gwydir@Allambie 16) 418079_Gingham@GinghamBridge Note: If you would like to ask a question, make any suggestions, or tell us how you are using this dataset, please visit the NSW Water Hub which has an online forum you can join.