Urban Development Program - Regional Greenfield Residential Land 2024
공공데이터포털
Identifies undeveloped land for residential development generally on the fringe of the urban area. Each record in the database details the subdivision and planning status of the land, the area of the site and the potential lot yield. Other details are also records against each site. Several key centres have been identified for analysis to be incorporated in the Regional Urban Development Program: Shepperton, Drouin, Warragul, Morwell, Churchill, Moe/Newborough,Traralgon, Mildura, Horsham, Gisborne, Kyneton, Winchelsea, Ballarat, Geelong, Bendigo. Data as of June 2024 unless noted otherwise This information maps land areas for both the supply and recent subdivision -Unzoned englobo land -Zoned englobo land -Recent subdivision into residential lots -Proposed lots -Lots with a title between January 2020 and July 2024 Urban Development Program (UDP).
Urban Development Program - Regional Greenfield Residential Land June 2021
공공데이터포털
Identifies undeveloped land for residential development generally on the fringe of the metropolitan area. Each record in the database details the subdivision and planning status of the land, the area of the site in hectares and the potential lot yield. Other details are also records against each site. Several key centres have been identified for analysis to be incorporated in the Regional Urban Development Program: Drouin, Warragul, Morwell, Churchill, Moe/Newborough,Traralgon, Mildura, Horsham, Gisborne, Kyneton, Winchelsea, Ballarat, Geelong, Bendigo This information maps land areas for both the supply and recent subdivision -Unzoned englobo land -Zoned englobo land -Recent subdivision into residential lots -Proposed lots -Lots with a title Urban Development Program (UDP).
Urban Development Program - Regional Greenfield Residential Land June 2022
공공데이터포털
Identifies undeveloped land for residential development generally on the fringe of the metropolitan area. Each record in the database details the subdivision and planning status of the land, the area of the site in hectares and the potential lot yield. Other details are also records against each site. Several key centres have been identified for analysis to be incorporated in the Regional Urban Development Program: Drouin, Warragul, Morwell, Churchill, Moe/Newborough,Traralgon, Mildura, Horsham, Gisborne, Kyneton, Winchelsea, Ballarat, Geelong, Bendigo This information maps land areas for both the supply and recent subdivision -Unzoned englobo land -Zoned englobo land -Recent subdivision into residential lots -Proposed lots -Lots with a title Urban Development Program (UDP).
Urban Development Program - Industrial Land 2022
공공데이터포털
The Urban Development Program (UDP) -Industrial Land. Identifies all industrial land and the development status and size of each land parcel in hectares across metropolitan Melbourne. This information identifies all industrial zoned land (Industrial 1, 2 and 3 as well as Commercial 2 Zone), and land of an industrial character and includes the Airport Business Parks, selected Special Use Zones, selected Comprehensive Development Zones and specific precincts within the Activity Centre Zones and Urban Growth Zones. Each land parcel is assessed as being either: Occupied - Parcels that contain industrial or commercial buildings, container parks, informal car parking, quarries, and hardstand storage areas. Zoned vacant - Parcels that are zoned for industrial use but have no intensive use / visible capital investment. Zoned non-industrial use - Parcels that are zoned for industrial use but have an existing use /capital investment that is not industrial. Examples include residential buildings and agricultural infrastructure. Over time these are likely to be redeveloped to industrial uses. Unzoned - Parcels identified in strategic plans for future industrial purposes.
Broadhectare Residential Land 2016
공공데이터포털
This data is now obsolete, current UDP data is available. Identifies undeveloped land for residential development generally on the fringe of the metropolitan area. Each record in the database details the anticipated development timing, the area of the site in hectares and the potential lot yield. Other details are also records against each site. This information maps land areas for both the supply and recent development categories they are; Supply area categoties >> 1-2years, 3-5years, 6-10years, 11+years, UGZ (PSP required) and Potential Residential Recently developed categories >> Developed land for years 2013, 2014 & land under construction. In addition to the development status categories, two other attributes describe whether the land is currently zoned residential and/or is low density.