데이터셋 상세
캘리포니아 오픈데이터
i17 StateWaterProject Centerline
This centerline has a multitude of potential uses for project tracking and spatial analysis. It is suitable for use as the base for a linear referencing system to record information about the State Water Project canal system, as a component of a hydrologic model, or simply as a cartographic element on both small and large scale maps. Canal centerlines were derived from the data in i17_StateWaterProject_Basemap. Pipeline and reservoir centerlines were copied from i17_StateWaterProject_Lines. The associated data are considered DWR enterprise GIS data, which meet all appropriate requirements of the DWR Spatial Data Standards, specifically the DWR Spatial Data Standard version 2.1, dated March 9, 2016. DWR makes no warranties or guarantees —either expressed or implied — as to the completeness, accuracy, or correctness of the data. DWR neither accepts nor assumes liability arising from or for any incorrect, incomplete, or misleading subject data.
데이터 정보
연관 데이터
i17 StateWaterProject Centerline
공공데이터포털
The purpose of this feature class is to delineate an approximate centerline for the State Water Project canals.,
i17 StateWaterProject ConstructionDivisions
공공데이터포털
,This is a line dataset that delineates the extent of State Water Project construction divisions. The locations of the construction divisions were derived from DWR records.,This dataset is current as of 3/20/2024.,
i17 StateWaterProject ConstructionDivisions
공공데이터포털
,This is a line dataset that delineates the extent of State Water Project construction divisions. The locations of the construction divisions were derived from DWR records.,This dataset is current as of 3/20/2024.,
i06 Bathy CP 20220830 GrantLineCanal
공공데이터포털
,
i03 Water Plan Planning Areas
공공데이터포털
Water Plan Planning Areas as part of the detailed Analysis’s Units (DAU) dataset. DAU boundaries match Cal-Fire dataset “cnty24k09_1_poly”.
i06 Bathy CP 20220830 MiddleRiver South
공공데이터포털
This dataset, (i06_SingleBeam_Bathymetry) is a feature dataset containing point feature classes with single beam bathymetric data collected by California Department of Water Resources and other entities.
i03 Water Plan Planning Areas
공공데이터포털
,Description for i03_DAU_county_cnty2018 is as follows:,,Detailed Analysis Unit-(DAU) Convergence via County Boundary cnty18_1 for Cal-Fire, (*See metadata for CAL-FIRE cnty18_1), State of California.,,The existing DAU boundaries were aligned with cnty18_1 feature class.,,Originally a collaboration by Department of Water Resources, Region Office personnel, Michael L. Serna, NRO, Jason Harbaugh - NCRO, Cynthia Moffett - SCRO and Robert Fastenau - SRO with the final merge of all data into a cohesive feature class to create i03_DAU_COUNTY_cnty24k09 alignment which has been updated to create i03_DAU_COUNTY_cnty18_1.,,This version was derived from a preexisting “dau_v2_105, 27, i03_DAU_COUNTY_cnty24k09” Detailed Analysis Unit feature class's and aligned with Cal-Fire's 2018 boundary.,,Manmade structures such as piers and breakers, small islands and coastal rocks have been removed from this version. Inlets waters are listed on the coast only.,,These features are reachable by County\DAU. This allows the county boundaries, the DAU boundaries and the State of California Boundary to match Cal-Fire cnty18_1.,,DAU Background,,The first investigation of California's water resources began in 1873 when President Ulysses S. Grant commissioned an investigation by Colonel B. S. Alexander of the U.S. Army Corps of Engineers. The state followed with its own study in 1878 when the State Engineer's office was created and filled by William Hammond Hall. The concept of a statewide water development project was first raised in 1919 by Lt. Robert B. Marshall of the U.S. Geological Survey.,,In 1931, State Engineer Edward Hyatt introduced a report identifying the facilities required and the economic means to accomplish a north-to-south water transfer. Called the "State Water Plan", the report took nine years to prepare. To implement the plan, the Legislature passed the Central Valley Act of 1933, which authorized the project. Due to lack of funds, the federal government took over the CVP as a public works project to provide jobs and its construction began in 1935.,,In 1945, the California Legislature authorized an investigation of statewide water resources and in 1947, the California Legislature requested that an investigation be conducted of the water resources as well as present and future water needs for all hydrologic regions in the State. Accordingly, DWR and its predecessor agencies began to collect the urban and agricultural land use and water use data that serve as the basis for the computations of current and projected water uses.,,The work, conducted by the Division of Water Resources (DWR’s predecessor) under the Department of Public Works, led to the publication of three important bulletins: Bulletin 1 (1951), "Water Resources of California," a collection of data on precipitation, unimpaired stream flows, flood flows and frequency, and water quality statewide; Bulletin 2 (1955), "Water Utilization and Requirements of California," estimates of water uses and forecasts of "ultimate" water needs; and Bulletin 3 (1957), "The California Water Plan," plans for full practical development of California’s water resources, both by local projects and a major State project to meet the State's ultimate needs. (**See brief addendum below** “The Development of Boundaries for Hydrologic Studies for the Sacramento Valley Region”),,DWR subdivided California into study areas for planning purposes. The largest study areas are the ten hydrologic regions (HR), corresponding to the State’s major drainage basins. The next levels of delineation are the Planning Areas (PA), which in turn are composed of multiple detailed analysis units (DAU). The DAUs are often split by county boundaries, so are the smallest study areas used by DWR.,,The DAU/counties are used for estimating water demand by agricultural crops and other surfaces for water resources planning. Under current guidelines, each DAU/County has multiple crop and land-use categories. Many planning studies begin
i06 Bathy CP 20220830 GrantLineCanal
공공데이터포털
,
i06 Bathy ESA 20190413 SutterBypass
공공데이터포털
,
i06 Bathy CP 20220830 OldRiver South
공공데이터포털
This dataset, (i06_SingleBeam_Bathymetry) is a feature dataset containing point feature classes with single beam bathymetric data collected by California Department of Water Resources and other entities.