데이터셋 상세
미국
Floodplain Study
The purpose of a floodplain study is to establish the 100-year floodplain limits within or near a development in order to preserve the natural resources within the 100-year floodplain, to protect property and persons, and to apply a unified, comprehensive approach to floodplain management. Update Frequency - Daily
데이터 정보
연관 데이터
Central Coast Council - Porters Creek Floodplain Risk Management Study
공공데이터포털
The overall objective of this study is to develop a Floodplain Risk Management Study where management issues are assessed, management options are investigated and recommendations are made. Thereafter a Floodplain Risk Management Plan detailing how flood prone land within the study area is to be managed can be completed. The objectives of the Flood Risk Management Study are to:,
Lake Macquarie City Council - Lake Macquarie - Floodplain Risk Management Study October 2000
공공데이터포털
The objectives of this study are: to define the nature and extent of the flood hazard, to identify, assess and optimise strategies and measures aimed at reducing the impact of flooding on both existing and future development, to determine the effects of development on flooding, to determine flood damages.
NSW Reconstruction Authority - Draft Hawkesbury-Nepean River Flood Study Overview
공공데이터포털
A 17-page overview of the purpose and methods used for developing the flood study.
Griffith City Council - Lake Wyangan Flood Study
공공데이터포털
Conclusions The objective of the study was to undertake a detailed flood study of the Lake Wyangan catchment and establish models as necessary for design flood level prediction. Through the undertaking of the flood study it has been found that during flood events the majority of the catchment runoff flows to Tharbogang Swamp rather than Lake Wyangan, as had previously been assumed. Historically there has been little response of Lake Wyangan water levels to rainfall events within the catchment, with only the March 1989 event producing a significant response. The limited response in Lake Wyangan is due to a number of factors: It has a relatively small catchment area of around 100km2, including diverted catchment runoff through the Lake View Drain (Lake Wyangan’s natural catchment is around 75km2); The calibration process found the catchment to indicate a high initial rainfall loss for the events considered. A large amount of rainfall (>60mm) is required before any catchment runoff is generated and a response in the lake can be observed; and A proportion of the catchment runoff volume is retained in temporary flood storages in the catchment, rather than further contributing to the flood storage in the lake. Being a volume-driven closed-catchment system with no natural outlet, flood levels in Lake Wyangan and Tharbogang Swamp are directly related to the catchment runoff volume generated by any given flood event. The high rainfall losses generate relatively small effective rainfall depths and the flood levels are therefore highly sensitive to changes in the adopted initial loss value. The calibration process found an initial loss value of around 60mm to be appropriate for the events considered. However, due to the characteristics of the available design rainfall temporal pattern, this loss value was reduced for design purposes. Tharbogang Swamp has a much larger catchment area than Lake Wyangan and therefore shows a much greater flood response. Unfortunately there has been no history of flood level recording in Tharbogang Swamp to compare to the modelled flood response. The study also identified a number of local overland flow paths which impact of the planned development areas of Council’s Growth Strategy 2030. It is important that these flow paths are taken into consideration during the stages of development planning. The flood study will form the basis for the subsequent floodplain risk management activities, being the next stage of the floodplain risk management process. The key locations to consider during this process have been identified as: Locations where there is potential for cross-catchment flow transfer from the Tharbogang Swamp catchment into Lake Wyangan (potential changes to the existing flow distribution may result from future on-ground works in these localities) ; and Locations where the floodways occur within the proposed development areas of the Giffith Growth Strategy 2030.
Central Coast Council - Lower Ourimbah Creek Floodplain Risk Management Study Review and Plan
공공데이터포털
The primary objective of the Lower Ourimbah Creek Floodplain Risk Management Study Review is to determine appropriate floodplain management measures for the preparation of a cost-effective Floodplain Risk Management Plan for the study area. The study addresses flooding caused by runoff in the Ourimbah Creek and its tributaries and does not address flooding caused by elevated water levels in Tuggerah Lakes independent of river flooding. Floodplain management for Tuggerah Lakes flooding is to be addressed in a separate study, currently under development.
Fairfield City Council - Old Guildford Overland Flood Study
공공데이터포털
Study Objectives Key objectives of this study are to:,