Laboratory Evaluation of EGS Shear Stimulation-Test 001
This is the results of an initial setup-shakedon test in order to develop the plumbing system for this test design. a cylinder of granite with offset holes was jacketed and subjected to confining pressure and low temperature (85C) and pore water pressure. Flow through the sample was developed at different test stages.
데이터 정보
연관 데이터
Hydroshear Simulation Lab Test 2
공공데이터포털
This data file is for test 2. In this test a sample of granite with a pre-cut (man made fracture) is confined, heated and differential stress is applied. The max temperature in this this system development test is 95C. More test details can be found on the spreadsheets--note that there are 2 spreadsheets
EGS Collab Experiment 2: Hydraulic Pressure Test Results
공공데이터포털
The EGS Collab experiment 2 was focused on testing shear stimulation techniques. Shear stimulation, in this case, means using hydraulic pressure to cause shear slip on preexisting fracture or fault planes such that the hydraulic conductivity of the fracture or fault increases. The concept is to create a percolating network of permeable fractures by enhancing the permeability of a primarily preexisting network of fractures. To test this concept the hydraulic pressures for experiment 2 were kept below the the estimated magnitude of the least compressive principal stress based on a set of stress measurements in nearby well TV4100. All tests for experiment 2 were performed by applying hydraulic pressure to well E2-TC. Subsequent stimulations in both E2-TC and E2-TU where the injection pressure was increased above the least compressive principal stress are considered part of experiment 3, which is documented separately. The data are organized in directories labeled by the depth range isolated between packers.
EGS Collab Experiment 1: Circulation Testing
공공데이터포털
These data and test descriptions comprise a chilled circulation test conducted at the 164' fracture in the EGS Collab Experiment 1 testbed on the 4850 ft level of the Sanford Underground Research Facility. Descriptions of the meta data, design drawings for the flow testing system, and evaluation of the thermistor data are provided here. The test ran from April 2019 through early March of 2020, when testing was concluded at the experiment 1 site. These data are are complementary to the stimulation data provided in another submission which is linked below (i.e. stimulation at the 164' notch). More information about the test itself as well as the rationale and process of data processing is available on the EGS Collab Experiment 1 Long Term Circulation Test wiki page which is also linked below.
EGS Collab Experiment 3: 4100 Tensile Stimulation and Thermal Circulation Testing
공공데이터포털
These data and test descriptions are from a set of primarily tensile hydraulic-fracture stimulations in wells E2-TC and E2-TU and a subsequent chilled water circulation test conducted by injecting in well E2-TU on the 4100 level of the Sandford Underground Research Facility (SURF). Stimulations were carried out between April and May of 2022. The thermal circulation test ran semi-continuously from May 19 through August 26, 2022, though chilled water injection began on June 3. More information about the test, rationale, and processing of data is available on the EGS Collab project page, which is linked below.
Hydroshear Simulation Lab Test 2, Additional Data Sheets
공공데이터포털
This file contains additional data for this test (hydroshear test 3.2). In this test a sample of granite with a pre-cut (man made fracture) is confined, heated and differential stress is applied. The max temperature in this this system development test is 95C. More test details can be found on the spreadsheets.