Advanced TidGen Power System - Deployment and Mooring System
공공데이터포털
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU) device. This submission includes the technical report on deployment and mooring system design requirements and subsystem risk analysis. A primary goal of the Advanced TidGen Power System project is to adapt ORPC's buoyant tensioned mooring system (BTMS) to the Advanced TidGen turbine generator unit (TGU). The TGU, as determined at the System Definition Review held in June 2017, is a dual-driveline, stacked system that implements hydrodynamic improvements for turbine design, turbine-turbine interactions and turbine-structure interactions. A major challenge for mooring and deployment system design will be to account for the substantial increases in loading incurred from increased power production and the resulting system drag during operation. Figure 1 shows the current system as presented for the Preliminary Design Review held in October 2017. This document addresses major risks, preventative measures, and mitigation strategies that have influenced this design and continue to drive development work toward the next design iteration. Also included is the technical report on mooring system design, supporting analytical models, and subsystem FMEA. Maine Marine Composites (MMC) has developed a simulation model to design a mooring system for Ocean Renewable Power Company) TidGen tidal energy converter. This document describes the simulation model, results, and the status of the current mooring system design. A preliminary anchor design is also proposed by MMC. The anchor is primarily a concrete gravity anchor. Structural steel is embedded inside the concrete to provide strength for the chain connection points. Steel L Channels also protrude underneath the concrete to act as a skirt to provide additional resistance.
TEAMER: Vertical Axies Hydrokinetic Turbine Data, Emrgy Inc. 2022, Post Access Submission
공공데이터포털
The data herein contains all data collected and used for the Performance Characterization Testing and Model Calibration of a Vertical Axis Hydrokinetic Turbine. The data includes performance data and durability data for the Hydrokinetic Turbine. The device performance data contains shaft RPM, turbine RPM, power output, flow velocity, pressure, and pressure drop across the turbine. The mechanical durability data includes stress and strain at varied depths and velocities. There is also an FEA analysis included. This TEAMER RFTS 4 (request for technical support) project was awarded to Emrgy, Inc.in collaboration with Alden Research Laboratory LLC.
Advanced TidGen Power System - Control and SCADA System
공공데이터포털
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU) device. This submission includes a technical report on control system development, supporting simulations and supervisory control and data acquisition (SCADA) system requirements. Also included is the final design of the control and SCADA system, with supporting simulations and risk mitigation control strategies to address major system technical risks.
Advanced TidGen Power System - Material Characterization Program
공공데이터포털
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU) device. This submission includes the test report on the characterization program composite testing and the selected composite structure. ORPC arranged coupon testing of candidate material sets as part of a larger characterization program. The goal of this testing was to down select the candidate material sets and determine failure mechanisms. This was done by testing both dry and saturated material sets and examining the effects of moisture uptake of the coupons mechanical properties. Due to the limitations of this program we were limited to static tensile testing is longitudinal and transverse directions as well as limited tensile fatigue testing with a loading of R=0.1 (tension - tension). This program did however, allow for a larger spread of material sets including a novel hydrophobic resin that was promoted to resist water uptake, optimized for subsea applications. Also included is a technical report on the characterization program, including composite test data, design FMEA for composite structure, material selection, composite design, PFMEA for the composite production process, reliability models, production process control plan and development plan. Materials for Marine Hydrokinetic (MHK) devices need to be evaluated before being utilized on a device with a service life of 20 years. For this reason, and the fact that ORPCs turbines are a complex manufacturing challenge, a composite optimization program is conducted. This program looked at novel material sets, production processes and developed tools to evaluate manufacturing defects and characterize their effect on structural performance over an extended operating time. This report will cover the work done during Budget Period 1 for Task 2 of the Advanced TidGen Power System Project.