데이터셋 상세
미국
River and Stream
The planimetric data was compiled by The Sanborn Map Company, Inc for the Metropolitan District and is based on an aerial flight performed in April 2015. In addition, the City's GIS staff has been updating limited planimetric features based on information on file in various City departments. The planimetric data has also been updated in 2016 and yearly to current based on spring aerial flights by EagleView.
데이터 정보
연관 데이터
Wharf and Pier
공공데이터포털
The planimetric data was compiled by The Sanborn Map Company, Inc for the Metropolitan District and is based on an aerial flight performed in April 2015. In addition, the City's GIS staff has been updating limited planimetric features based on information on file in various City departments. The planimetric data has also been updated in 2016 and yearly to current based on spring aerial flights by EagleView.
i07 FloodSystemMetric Polygon
공공데이터포털
,The Central Valley Flood Protection Plan (CVFPP) recommends that the California Department of Water Resources (DWR) develop a system for tracking performance of the flood system, including the following actions:,• Track the outcomes from flood investments to demonstrate value.,• Monitor and track outcomes of multi-benefit projects over time.,• Create a tracking system of operations and maintenance investments and outcomes to demonstrate the value that Local Maintaining Agencies attain for their investments.,• Track and report changes in the hydrologic and sea level rise conditions and subsidence over time through updates to the Flood System Status Report (FSSR),These recommendations stem from progressive work during the development of the 2012 CVFPP and subsequent 2017 CVFPP update. The DWR Flood Performance Tracking System tracks the CVFPP outcomes related to: (1) improving flood risk management and (2) enhancing ecosystem vitality. This tracking system has the ability to track the status, trends, and changes over time of the ecosystem (including the Conservation Strategy’s Measurable Objectives [CSMOs] as of 2016) outlined in the Conservation Strategy document here: https://cawaterlibrary.net/wp-content/uploads/2017/10/ConservStrat-Nov2016.pdf along with the Flood System metrics outlined in the Flood System Status Report here: https://water.ca.gov/Programs/Flood-Management/Flood-Planning-and-Studies/Central-Valley-Flood-Protection-Plan.,The associated data are considered DWR enterprise GIS data, which meet all appropriate requirements of the DWR Spatial Data Standards, specifically the DWR Spatial Data Standard version 3.1, dated September 11, 2019.,This data set was not produced by DWR. Data were originally developed and supplied by ESA, under contract to California Department of Water Resources. DWR makes no warranties or guarantees — either expressed or implied — as to the completeness, accuracy, or correctness of the data. DWR neither accepts nor assumes liability arising from or for any incorrect, incomplete, or misleading subject data.,Comments, problems, improvements, updates, or suggestions should be forwarded to gis@water.ca.gov.,
i07 FloodSystemMetric Line
공공데이터포털
,The Central Valley Flood Protection Plan (CVFPP) recommends that the California Department of Water Resources (DWR) develop a system for tracking performance of the flood system, including the following actions:,• Track the outcomes from flood investments to demonstrate value.,• Monitor and track outcomes of multi-benefit projects over time.,• Create a tracking system of operations and maintenance investments and outcomes to demonstrate the value that Local Maintaining Agencies attain for their investments.,• Track and report changes in the hydrologic and sea level rise conditions and subsidence over time through updates to the Flood System Status Report (FSSR),These recommendations stem from progressive work during the development of the 2012 CVFPP and subsequent 2017 CVFPP update. The DWR Flood Performance Tracking System tracks the CVFPP outcomes related to: (1) improving flood risk management and (2) enhancing ecosystem vitality. This tracking system has the ability to track the status, trends, and changes over time of the ecosystem (including the Conservation Strategy’s Measurable Objectives [CSMOs] as of 2016) outlined in the Conservation Strategy document here: https://cawaterlibrary.net/wp-content/uploads/2017/10/ConservStrat-Nov2016.pdf along with the Flood System metrics outlined in the Flood System Status Report here: https://water.ca.gov/Programs/Flood-Management/Flood-Planning-and-Studies/Central-Valley-Flood-Protection-Plan.,The associated data are considered DWR enterprise GIS data, which meet all appropriate requirements of the DWR Spatial Data Standards, specifically the DWR Spatial Data Standard version 3.1, dated September 11, 2019.,This data set was not produced by DWR. Data were originally developed and supplied by ESA, under contract to California Department of Water Resources. DWR makes no warranties or guarantees — either expressed or implied — as to the completeness, accuracy, or correctness of the data. DWR neither accepts nor assumes liability arising from or for any incorrect, incomplete, or misleading subject data.,Comments, problems, improvements, updates, or suggestions should be forwarded to gis@water.ca.gov.,
i07 FloodSystemMetric Point
공공데이터포털
,The Central Valley Flood Protection Plan (CVFPP) recommends that the California Department of Water Resources (DWR) develop a system for tracking performance of the flood system, including the following actions:,• Track the outcomes from flood investments to demonstrate value.,• Monitor and track outcomes of multi-benefit projects over time.,• Create a tracking system of operations and maintenance investments and outcomes to demonstrate the value that Local Maintaining Agencies attain for their investments.,• Track and report changes in the hydrologic and sea level rise conditions and subsidence over time through updates to the Flood System Status Report (FSSR),These recommendations stem from progressive work during the development of the 2012 CVFPP and subsequent 2017 CVFPP update. The DWR Flood Performance Tracking System tracks the CVFPP outcomes related to: (1) improving flood risk management and (2) enhancing ecosystem vitality. This tracking system has the ability to track the status, trends, and changes over time of the ecosystem (including the Conservation Strategy’s Measurable Objectives [CSMOs] as of 2016) outlined in the Conservation Strategy document here: https://cawaterlibrary.net/wp-content/uploads/2017/10/ConservStrat-Nov2016.pdf along with the Flood System metrics outlined in the Flood System Status Report here: https://water.ca.gov/Programs/Flood-Management/Flood-Planning-and-Studies/Central-Valley-Flood-Protection-Plan.,The associated data are considered DWR enterprise GIS data, which meet all appropriate requirements of the DWR Spatial Data Standards, specifically the DWR Spatial Data Standard version 3.1, dated September 11, 2019.,This data set was not produced by DWR. Data were originally developed and supplied by ESA, under contract to California Department of Water Resources. DWR makes no warranties or guarantees — either expressed or implied — as to the completeness, accuracy, or correctness of the data. DWR neither accepts nor assumes liability arising from or for any incorrect, incomplete, or misleading subject data.,Comments, problems, improvements, updates, or suggestions should be forwarded to gis@water.ca.gov.,
Curb
공공데이터포털
The planimetric data was compiled by The Sanborn Map Company, Inc for the Metropolitan District and is based on an aerial flight performed in April 2015. In addition, the City's GIS staff has been updating limited planimetric features based on information on file in various City departments. The planimetric data has also been updated in 2016 and yearly to current based on spring aerial flights by EagleView.
i03 Hydrologic Regions
공공데이터포털
Department of Water Resources Hydrologic Region boundaries derived from i03_DAU_county_cnty2018.
Fence
공공데이터포털
The planimetric data was compiled by The Sanborn Map Company, Inc for the Metropolitan District and is based on an aerial flight performed in April 2015. In addition, the City's GIS staff has been updating limited planimetric features based on information on file in various City departments. The planimetric data has also been updated in 2016 and yearly to current based on spring aerial flights by EagleView.
i08 C2VSimFG Subregions
공공데이터포털
,
i08 C2VSimFG Elements
공공데이터포털
,
i08 C2VSimFG Nodes
공공데이터포털
,