Advanced Control Systems for Wave Energy Converters
공공데이터포털
This submission contains several papers, a final report, descriptions of a theoretical framework for two types of control systems, and descriptions of eight real-time flap load control policies with the objective of assessing the potential improvement of annual average capture efficiency at a reference site on an MHK device developed by Resolute Marine Energy, Inc. (RME). The submission also contains an LCOE model that estimates the performance and related energy cost improvements that each advanced control system might provide and recommendations for improving DOE's LCOE model. The two types of control systems are for wave energy converters which transform data into commands that, in the case of RME's OWSC wave energy converter, provide real-time adjustments to damping forces applied to the prime mover via the power take-off system (PTO). The control theories developed were: 1) Model Predictive Control (MPC) or so-called "non-causal" control whereby sensors deployed seaward of a wave energy converter measure incoming wave characteristics and transmit that information to a data processor which issues commands to the PTO to adjust the damping force to an optimal value; and 2) "Causal" control which utilizes local sensors on the wave energy converter itself to transmit information to a data processor which then issues appropriate commands to the PTO. The two advanced control policies developed by Scruggs and Re Vision were then compared to a simple control policy, Coulomb damping, which was utilized by RME during the two rounds of ocean trials it had conducted prior to the commencement of this project. The project work plan initially included a provision for RME to conduct hardware-in-the-loop (HIL) testing of the data processors and configurations of valves, sensors and rectifiers needed to implement the two advanced control systems developed by Scruggs and Re Vision Consulting but the funding for that aspect of the project was cut at the conclusion of Budget Period 1. Accordingly, more work needs to be done to determine: a) means and feasibility of implementing real-time control; and b) added costs associated with such implementation taking into account estimated effects on system availability in addition to component costs.
WEC Controls Optimization Final Report
공공데이터포털
The over-arching project objective is to fully develop and validate optimal controls frameworks that can subsequently be applied widely to different WEC devices and concepts. Optimal controls of WEC devices represent a fundamental building block for WEC designers that must be considered as an integral part of every stage of device development. Using a building-blocks approach to optimal controls development, this effort will result in the full development of a feed-forward and feed-back control approach and a wave prediction system. Phase I focused primarily on numerical offline optimization and validation using wave tank testing of three industry partners? WEC devices, including CalWave, Ocean Energy, and Resolute Marine Energy. These industry partnerships allowed us to identify optimal control strategies for these different WEC topologies at different maturity levels. Phase II focused on demonstrating an integrated control system on a custom-built prototype for at-sea testing. A secondary focus during phase II is to adapt our systems identification, controls and wave-prediction frameworks to become more robust and comprehensive in respect to capability, robustness, and reliability. RE Vision Consulting leads this project and has compiled the final public domain report included in this submission.
Centipod WEC, Advanced Controls, Final Technical Report
공공데이터포털
Final Technical Report for "Advanced Controls for the Multi-pod Centipod WEC device" describing project parameters, organization, task activities, accomplishments, and conclusions. See other submissions under this DOE project for economic viability, design geometry, and modeling.
Centipod WEC, Advanced Controls, Quarterly Technical Report
공공데이터포털
Quarterly Technical Report for "Advanced Controls for the Multi-pod Centipod WEC device" describing project parameters, organization, task activities, accomplishments, and conclusions. See other submissions under this DOE project for economic viability, design geometry, and modeling. The purpose of this quarterly report is to release a progress report immediately, while the final report and remaining project items await release before the moratorium date.