Utah FORGE: Phase 3A Year 1 Annual Report for 2020
공공데이터포털
This is the Utah FORGE annual report for Phase 3A year 1, which was completed on December 28th, 2020. This report includes site infrastructure, site operations, seismic monitoring, a conceptual geological model, outreach, and communications for the Utah FORGE project during Phase 3A in 2020. Utah FORGE projects showcase the role of geothermal energy and Enhanced Geothermal Systems (EGS) as a renewable source of power for the United States. The geoscientific investigations done in the Utah FORGE projects demonstrate the surrounding region holds significant potential for future EGS development.
Utah FORGE: 2020-2021 Geothermal Energy/EGS Survey and Results
공공데이터포털
The Utah FORGE project collaborated with the University of Utahs Department of Communication on a Capstone course during Fall Semester 2020. The course created a survey to gauge the general populations knowledge of geothermal energy and Enhanced Geothermal Systems (EGS). The survey was distributed through Qualtrics, an experience management company, in late 2020 and early 2021 to respondents in 11 western states (AZ, CA, CO, ID, MT, NM, NV, OR, UT, WA, WY). Approximately 1,000 responses were received. The Code Book (the consent form and the questions themselves) and the raw data results in a spreadsheet are included in the data resources.
Utah FORGE: 2020-2021 Geothermal Energy/EGS Survey and Results
공공데이터포털
The Utah FORGE project collaborated with the University of Utahs Department of Communication on a Capstone course during Fall Semester 2020. The course created a survey to gauge the general populations knowledge of geothermal energy and Enhanced Geothermal Systems (EGS). The survey was distributed through Qualtrics, an experience management company, in late 2020 and early 2021 to respondents in 11 western states (AZ, CA, CO, ID, MT, NM, NV, OR, UT, WA, WY). Approximately 1,000 responses were received. The Code Book (the consent form and the questions themselves) and the raw data results in a spreadsheet are included in the data resources.
Utah FORGE Phase 3A Year 1 Annual Report for 2020
공공데이터포털
This is the Utah FORGE annual report for Phase 3A year 1, which was completed on December 28th, 2020. This report includes site infrastructure, site operations, seismic monitoring, a conceptual geological model, outreach, and communications for the Utah FORGE project during Phase 3A in 2020. Utah FORGE projects showcase the role of geothermal energy and Enhanced Geothermal Systems (EGS) as a renewable source of power for the United States. The geoscientific investigations done in the Utah FORGE projects demonstrate the surrounding region holds significant potential for future EGS development.
Utah FORGE: Phase 3A, Year 2, Annual Report
공공데이터포털
This is the annual report for Utah FORGE Phase 3A, year two, which was published on July 28th, 2022. The report includes site infrastructure, site operations, seismic monitoring reports, FORGE modeling reports, and external research and design. The ultimate objective of Utah FORGE is to demonstrate the viability of Enhanced Geothermal System (EGS) energy development. This report presents an overview of Phase 3A Year 2 activities. Year 1 activities transitioned the Utah FORGE project from site characterization and baseline monitoring to infrastructure development required for full deployment of the Utah FORGE laboratory.