Wind Techno-economic Exclusion
공공데이터포털
,The site suitability criteria included in the techno-economic land use screens are listed below. As this list is an update to previous cycles, tribal lands, prime farmland, and flood zones are not included as they are not technically infeasible for development. The techno-economic site suitability exclusion thresholds are presented in table 1. Distances indicate the minimum distance from each feature for commercial scale wind development,Attributes:,,
Utility Wind Project Size by County and State: 2023
공공데이터포털
,Dec. 22, 2025; Produced by the California Energy Commission; Projection: NAD 1983 (2011) Contiguous USA Albers; Data: Energy Information Administration (EIA-860) and the Wind Generation Reporting System. For more information, contact John Hingtgen at John.hingtgen@energy.ca.gov. The map illustrates the variation in median plant capacity across the United States and California of wind plants with nameplate capacity of at least 1 MW. Median plant capacity depends on the statewide capacity and the number of plants 0 60 120 240 Miles within the defined area.,
Utility Wind Project Size by County and State: 2023
공공데이터포털
,Dec. 22, 2025; Produced by the California Energy Commission; Projection: NAD 1983 (2011) Contiguous USA Albers; Data: Energy Information Administration (EIA-860) and the Wind Generation Reporting System. For more information, contact John Hingtgen at John.hingtgen@energy.ca.gov. The map illustrates the variation in median plant capacity across the United States and California of wind plants with nameplate capacity of at least 1 MW. Median plant capacity depends on the statewide capacity and the number of plants 0 60 120 240 Miles within the defined area.,