데이터셋 상세
런던 데이터스토어
UK Power Networks - Enable
As part of our Enable project, we estimated the projected number of on-street disabled parking bays and Blue Badge holders in our licence areas by 2030. This data is available at the Lower Layer Super Output Area (LSOA) level. We hope that this data will help local authorities and charge point operators plan for accessible transport provision for customers. More information on what we're doing for accessible transport can be found at UK Power Networks Accessible transport information hub and Project Enable Please note, the dataset contains estimations and are not true values.
데이터 정보
연관 데이터
UK Power Networks - Optimise Prime
공공데이터포털
Optimise Prime has gathered data from over 6,000 Electric Vehicles (EVs) driven for commercial purposes through three trials. The project also implemented a range of technical and commercial solutions aiming to accelerate the transition to EVs for commercial fleet operators, while helping GB’s distribution networks plan and prepare for the mass adoption of EVs. The project aimed to reduce the impact of EVs on distribution networks and ensure security of electricity supply while saving money for electricity customers, helping the UK meet its clean air and climate change objectives. The project consisted of three trial workstreams (WS): WS1, investigating the impact of commercial vehicles charging at homes WS2, monitoring and optimising commercial vehicles charging in depots WS3, which uses private hire vehicle (PHV) journey data to model the impact of these vehicles on the distribution network. The trial period for WS3 began in August 2020, with WS1 and WS2 trials commencing on 1 July 2021. All trials concluded at the end of June 2022. Optimise Prime is sharing the project datasets by making them publicly available to the wider electricity, fleet and PHV industry to optimise their vehicle electrification plans. DNOs, academics and interested parties will be able to utilise this anonymised data created by the project for further research, analysis and forecasting. Along with the datasets, an introductory document is available below, it provides information on the content of those datasets, guidance on how to interpret each data field and instructions on how to access the data. Over the course of the trials, the project has collected and analysed data from a wide range of sources in order to carry out a wide range of experiments. The key datasets collected and used in analysis are available here. These includes: WS1 – Return-to-Home Trials · Charge Point (CP) session data · Vehicle telematics journey data WS2 – Depot Trials · Details of the assets and asset types at each depot · Charging data gathered from the CPs at each depot · Building load measurement data from each depot · Details of the profiled connections, flexibility trials and smart charging profiles trialled at each depot WS3 – Mixed Trials · PHV charging demand overlaid onto substation available capacity data aggregated by borough The project is not able to release all data collected and used by the project, as some are commercially confidential to the project partners (such as precise volumes of Uber trips or substation capacities), contains potentially personally identifiable information (such as precise start and end locations of home charging journeys or Uber trips) or were purchased by the project under license (e.g. charge point (CP) locations, weather data and off-street parking data). Access the data via this link: https://ukpowernetworks.opendatasoft.com/explore/dataset/optimise-prime/information/ The figure below shows how the datasets are built:
UK Power Networks - Low Carbon London Electric Vehicle Load Profiles
공공데이터포털
Data collected relating to load profiles for electric vehicle charging, part of the Low Carbon London (LCL) project delivered by UK Power Networks. Data has been anonymised. For further queries contact innovation@ukpowernetworks.co.uk Folders: EV Commercial trials Folder contains raw data from LCL EV commercial trials (2013 - 2014) Files ordered by customer with ten-minute time stamps of EV activity. EV Public trials List of charging events of four different suppliers of public charge points. EV Residential trials Folder contains raw data from LCL EV residential trials (2013 - 2014) – sorted by customer. Files ordered by customer with ten-minute time stamps of EV activity. Also contained are anonymised surveys about EV habits.