데이터셋 상세
런던 데이터스토어
Planning Data Team - London’s housing data from AMR13
Full listings of the residential units in London’s housing pipeline as at 31/03/2016 and completed between 01/04/20015 and 31/03/2016 from the London Development Database (LDD). The LDD records significant planning permissions in London. The data is entered by the London Boroughs and is checked by the GLA to ensure consistency across London. The LDD records any planning consent that permits the loss or gain of one or more residential units. This data was used to compile the housing monitor in the London Plan Annual Monitoring Report 13. it will not be updated.
데이터 정보
연관 데이터
Planning Data Team - London Plan AMR14 Tables and Data
공공데이터포털
The London Plan Annual Monitoring Report (AMR) 14 covers the period from 1st April 2016 to 31st March 2017. It provides information about progress being made in implementing the policies and addressing the objectives of the London Plan 2016 by showing how London is performing against the 24 Key Performance Indicators (KPIs) identified in Chapter 8 of the Plan. Chapter 3 of the AMR provides additional performance measures and statistics. and includes the Housing Provision Annual Monitor which uses the planning permissions data from the London Development Database to provide a more detailed assessment of housing development in London than is shown by the KPIs. All of the tables from Chapters 2 (KPIs) and 3 (Additional performance measures and statistics) are provided below, as are the data sets used to compile the Housing Provision Annual Monitor.
Greater London Authority - Residential completions v London Plan 2021 target
공공데이터포털
Planning Data - Residential pipeline dashboard
공공데이터포털
This dashboard calculates the residential pipeline at the end of each financial year using data from the Planning London Datahub (PLD). Data on the datahub is data that is supplied by applicants and Planning Authorities. Due to the nature of how it is collected and assimilated, it is not checked for quality as it is received, and as such may require to be amended as data quality reviews are completed and specific analysis highlights deficiencies. Boroughs supply starts and completions data on an annual basis. We are currently running a data improvement program, increasing the availability and quality of the data. If you are looking to use this data for analysis please review the core data for any error before relying on it. It is currently still in development and the totals displayed will change. Other residential dashboards from the Planning London Datahub: Residential approvals Residential commencements Residential completions Back to top
GLA - London Plan AMR 16 tables and data
공공데이터포털
The London Plan Annual Monitoring Report (AMR) 16 focuses on the period from 1st April 2018 to 31st March 2019. It provides information about progress being made in implementing the policies and addressing the objectives of the London Plan 2016 by showing how London is performing against the 24 Key Performance Indicators (KPIs) identified in Chapter 8 of the London Plan 2016. Chapter 3 of the AMR provides additional performance measures and statistics, and includes the Housing Provision Annual Monitor which uses the planning permissions data from the London Development Database to provide a more detailed assessment of housing development in London than is shown by the KPIs. All of the tables from Chapters 2 (KPIs) and 3 (Additional performance measures and statistics) are provided below, along with the housing data used in the Housing Provision Annual Monitor. A PDF of AMR 16 can be downloaded from https://www.london.gov.uk/what-we-do/planning/implementing-london-plan/monitoring-london-plan
GLA - London Plan AMR 15 tables and data
공공데이터포털
The London Plan Annual Monitoring Report (AMR) 15 covers the period from 1st April 2017 to 31st March 2018. It provides information about progress being made in implementing the policies and addressing the objectives of the London Plan 2016 by showing how London is performing against the 24 Key Performance Indicators (KPIs) identified in Chapter 8 of the Plan. Chapter 3 of the AMR provides additional performance measures and statistics, and includes the Housing Provision Annual Monitor which uses the planning permissions data from the London Development Database to provide a more detailed assessment of housing development in London than is shown by the KPIs. All of the tables from Chapters 2 (KPIs) and 3 (Additional performance measures and statistics) are provided below, along with the housing data used in the Housing Provision Annual Monitor. AMR 15 can be downloaded from https://www.london.gov.uk/what-we-do/planning/implementing-london-plan/monitoring-london-plan
Planning data - Residential completions dashboard
공공데이터포털
This dashboard provides details of residential completions from the Planning London Datahub (PLD). Data on the datahub is data that is supplied by applicants and Planning Authorities. Due to the nature of how it is collected and assimilated, it is not checked for quality as it is received, and as such may require to be amended as data quality reviews are completed and specific analysis highlights deficiencies. Boroughs supply starts and completions data on an annual basis. We are currently running a data improvement program, increasing the availability and quality of the data. If you are looking to use this data for analysis please review the core data for any error before relying on it. Other residential dashboards from the Planning London Datahub: Residential approvals Residential commencements Residential pipeline
Greater London Authority - Affordable Housing Open Data
공공데이터포털
Building affordable and council homes is a priority for the Mayor in tackling London's housing crisis and a key component of the London Housing Strategy. The GLA Housing team monitor a range of housing statistics produced by the Department for Levelling Up, Housing and Communities (DLUHC), and this spreadsheet contains a section from the Affordable Housing Open Data. This data has been used to measure the number of affordable and council homes built in London since 2016/17 and includes all affordable homes built, including those which did not receive funding from the GLA. This dataset does not incorporate DLUHC data for 2021/22 or GLA data for 2022/23.
The Planning Data team - Residential approvals of M4(2) Accessible and adaptable and M4(3) Wheelchair user dwellings
공공데이터포털
This report uses data from the Planning London Datahub (PLD) to show the proportion of new-build residential dwellings that meet the access standards M4(2) Accessible and adaptable dwellings and M4(3) Wheelchair user dwellings, as set out in Part M of the Building Regulations, Access to and use of buildings. The data is broken down by borough and year. Information on individual applications can be found on the Planning London Datahub, or on our Residential Approvals dashboard. Completions can be viewed at Residential Completions dashboard Please note that compliance with part M of the building regulations is not confirmed at application stage, but must be included as a condition on the decision notice when planning permission is granted. We are currently working with London's planning authorities to ensure that the PLD is being correctly updated with the M4 compliance information at the time the decision is issued. The data is therefore currently assumed to under represent the true picture. The dashboard will automatically update as more data becomes available.
Greater London Authority - Ealing residential pipeline
공공데이터포털
The residential pipeline for the London Borough of Ealing as at 31st March 20222. The data was extracted from the Planning London Datahub on 29/11/2022 and is subject to further checking.