데이터셋 상세
호주
GSQOpenData@dnrme.qld.gov.au - EPM 25816 Partial Relinquishment Report 11062021
URL: https://geoscience.data.qld.gov.au/dataset/cr124526 In accordance with the Mineral Resources Act (1989) Qld, Kronos Gold LLC (Kronos) provides below a Partial Relinquishment Report for Exploration Permit for Mineral (EPM) 25816. This report outlines the sub-blocks within EPM 25816 that form the basis for this partial relinquishment, in addition to providing a description of the work completed on these sub-blocks by Kronos Gold LLC since the tenure was granted to Kronos on 30 June 2015. EPM 25816 is approximately 300km south-west of Cairns and 35km south-west of Einasleigh, North Queensland (Data – maps – EPM 25816 location map). The project is within the Georgetown and Einasleigh 1:250,000 map sheets, and the Forsayth and Einasleigh 1:100,000 map sheets. Access to the project area is via station tracks west of Kidston and south of Einasleigh. The tenure was acquired as part of Kronos Gold’s exploration strategy to discover Intrusion-Related Gold Deposits (IRGD) (such as the Kidston gold mine) and Broken Hill Type (BHT) deposits in Queensland. The main exploration targets for the project area are gold and base metals. Kronos completed a desktop review and collected and analysed 32 separate soil and 12 rock chip samples on the sub-blocks that are the subject of this relinquishment (Data – Samples and Analysis (incl. Geochemistry). Kronos also completed a desktop study and geophysical reprocessing within the relinquished area.
데이터 정보
연관 데이터
GSQOpenData@dnrme.qld.gov.au - EPM 19863, DOBI, MINERALS PROJECT, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 20/2/2017
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr102037 EPM 19863, DOBI, MINERALS PROJECT, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 20/2/2017
GSQOpenData@dnrme.qld.gov.au - EXPLORATION PERMIT FOR MINERALS (EPM), WANGUNDA, PARTIAL RELINQUISHMENT REPORT FOR THE PERIOD ENDING 16 MAY 2020
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr120092 EXPLORATION PERMIT FOR MINERALS (EPM), WANGUNDA, PARTIAL RELINQUISHMENT REPORT FOR THE PERIOD ENDING 16 MAY 2020
GSQOpenData@dnrme.qld.gov.au - EPM 9680, MICLERE GOLD PROJECT, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 7/12/2003
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr036095 EPM 9680, MICLERE GOLD PROJECT, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 7/12/2003
GSQOpenData@dnrme.qld.gov.au - EPM 25785, TRAPROCK GOLD PROJECT, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 5/5/2016
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr097076 EPM 25785, TRAPROCK GOLD PROJECT, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 5/5/2016
GSQOpenData@resources.qld.gov.au - EPM17634 CAMERON RIVER 3 PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 28 JUNE 2018
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr133402 This Partial Relinquishment Report outlines exploration activities undertaken by CST Minerals Exploration Pty Ltd on EPM17634 between 27th October 2011 and 28th June 2018.
GSQOpenData@dnrme.qld.gov.au - EPM8937 Partial Relinquishment Report (Period Ending 06/09/2020)
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr121055 A total of eight (8) sub-blocks were submitted for relinquishment within EPM8937 in order to comply with the Department of Natural Resources, Mines and Energy (DNRME) policy of the progressive reduction of tenure. Within the 8 sub-blocks relinquished, Pursuit has not completed any mineral exploration during the time period of its ownership of EPM8937 (August 2017 until the date of this report). Previous holders of EOPM8937 completed four diamond drill holes within the relinquished area.
GSQOpenData@dnrme.qld.gov.au - EPM 15619, PIONEER GOLD PROJECT, GAETA GOLD MINERAL FIELD, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 1/8/2013
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr079402 EPM 15619, PIONEER GOLD PROJECT, GAETA GOLD MINERAL FIELD, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 1/8/2013
GSQOpenData@dnrme.qld.gov.au - EPM 26158, MICLERE NORTH - BLACKRIDGE GOLD PROJECT, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 26/7/2017
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr119414 EPM 26158, MICLERE NORTH - BLACKRIDGE GOLD PROJECT, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 26/7/2017
GSQOpenData@resources.qld.gov.au - ATP2021 PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 31 MAY 2023
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr143026 Report for the partial relinquishment of sub-blocks from ATP 2021
GSQOpenData@dnrme.qld.gov.au - EPM 2005, SARINA, MINERAL RESOURCE DEVELOPMENT, REPORT ON AREA RELINQUISHED 29/2/1979
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr008338 EPM 2005, SARINA, MINERAL RESOURCE DEVELOPMENT, REPORT ON AREA RELINQUISHED 29/2/1979