데이터셋 상세
호주
GSQOpenData@dnrme.qld.gov.au - EXPLORATION PERMIT FOR MINERALS (EPM), WANGUNDA, PARTIAL RELINQUISHMENT REPORT FOR THE PERIOD ENDING 16 MAY 2020
URL: https://geoscience.data.qld.gov.au/dataset/cr120092 EXPLORATION PERMIT FOR MINERALS (EPM), WANGUNDA, PARTIAL RELINQUISHMENT REPORT FOR THE PERIOD ENDING 16 MAY 2020
데이터 정보
연관 데이터
GSQOpenData@resources.qld.gov.au - Exploration Permit for Minerals: 17313, Malbon. Annual Report for the Period 24th May 2018 to 23rd May 2019
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr120733 Exploration Permit for Minerals: 17313, Malbon. Annual Report for the Period 24th May 2018 to 23rd May 2019
GSQOpenData@resources.qld.gov.au - Exploration Permit for Minerals: 18511, Brightlands. Annual Report for the Period 30th April 2018 to 29th April 2019
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr120849 Exploration Permit for Minerals: 18511, Brightlands. Annual Report for the Period 30th April 2018 to 29th April 2019
GSQOpenData@dnrme.qld.gov.au - EPM 19863, DOBI, MINERALS PROJECT, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 20/2/2017
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr102037 EPM 19863, DOBI, MINERALS PROJECT, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 20/2/2017
GSQOpenData@dnrme.qld.gov.au - EPM 25816 Partial Relinquishment Report 11062021
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr124526 In accordance with the Mineral Resources Act (1989) Qld, Kronos Gold LLC (Kronos) provides below a Partial Relinquishment Report for Exploration Permit for Mineral (EPM) 25816. This report outlines the sub-blocks within EPM 25816 that form the basis for this partial relinquishment, in addition to providing a description of the work completed on these sub-blocks by Kronos Gold LLC since the tenure was granted to Kronos on 30 June 2015. EPM 25816 is approximately 300km south-west of Cairns and 35km south-west of Einasleigh, North Queensland (Data – maps – EPM 25816 location map). The project is within the Georgetown and Einasleigh 1:250,000 map sheets, and the Forsayth and Einasleigh 1:100,000 map sheets. Access to the project area is via station tracks west of Kidston and south of Einasleigh. The tenure was acquired as part of Kronos Gold’s exploration strategy to discover Intrusion-Related Gold Deposits (IRGD) (such as the Kidston gold mine) and Broken Hill Type (BHT) deposits in Queensland. The main exploration targets for the project area are gold and base metals. Kronos completed a desktop review and collected and analysed 32 separate soil and 12 rock chip samples on the sub-blocks that are the subject of this relinquishment (Data – Samples and Analysis (incl. Geochemistry). Kronos also completed a desktop study and geophysical reprocessing within the relinquished area.
GSQOpenData@dnrme.qld.gov.au - EPM 25474 FINAL REPORT
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr120143 This report describes all mineral exploration work carried out by South32 on EPM 25474 “Lucknow East” (the EPM) during the reporting period 4th August 2014, when the tenement was granted, through to 3rd August 2020.
GSQOpenData@dnrme.qld.gov.au - EPM 2510, EXPLORATION AND RELINQUISHMENT REPORT, (FINAL REPORT)
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr010002 EPM 2510, EXPLORATION AND RELINQUISHMENT REPORT, (FINAL REPORT)
GSQOpenData@resources.qld.gov.au - EPM26411 LINCOLN SPRINGS PROJECT FINAL REPORT FOR PERIOD ENDING 19 NOVEMBER 2022
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr142264 Australian Lime Company Pty Ltd ABN 29 096 102 788 holds Exploration Permits for Minerals (EPMs) in the Broken River Province (Figure 1) in Northern Queensland, near Ingham, comprising EPM 26411 and EPM 26716 (Application)(Figure 2), with the potential for the discovery of various minerals including cobalt, copper, lead, zinc and gold. This report details the exploration activities carried out at the Lincoln Springs Project, comprising EPM 26411, during the period 20th November 2017 to 19th November 2022. The project is considered prospective for base and precious metals in particular cobalt, copper, lead, zinc, silver and gold. No Activities were conducted within EPM26411 during this final period.
GSQOpenData@dnrme.qld.gov.au - EPM 9680, MICLERE GOLD PROJECT, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 7/12/2003
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr036095 EPM 9680, MICLERE GOLD PROJECT, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 7/12/2003
GSQOpenData@resources.qld.gov.au - EPM26740 BULIMBA ANNUAL ACTIVITY REPORT FOR PERIOD ENDING 01 AUGUST 2022
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr133926 Exploration Permit Minerals (EPM) 26740 was granted to Newcrest Operations Limited (Newcrest) on 1 August 2018 for a term of five (5) years. EPM26740 forms part of the companys Bulimba Project, which consists of six (6) granted Exploration Permit Minerals; EPM26530, EPM26531, EPM26532, EPM26533, EPM26738 and EPM26740, located approximately 50km northwest of Chillagoe and 200km west of Cairns in northeast Queensland. The exploration permit is located within the Walsh (7664) 1 to 100,000 and Walsh (SE5404) 1 to 250,000 map sheets. The Bulimba Project is considered highly prospective for gold (Au) and copper (Cu) resources. The Bulimba Project tenure is positioned within a fertile structural corridor which hosts major gold-copper deposits such as the Red Dome and Mungana deposits and is therefore considered highly prospective for gold (Au) and copper (Cu) resources. The cover that exists over most of the project area has prevented effective previous exploration, providing an excellent opportunity for Newcrest to open up a new, province-scale area to systematic exploration. Exploration activity across Newcrests Queensland exploration tenure was significantly disrupted in 2021; due to Government covid policies; and consequent restrictions placed upon the travel, movement, and associations of employees, landholders, traditional owners and business partners. These imposed conditions severely affected the ability to effectively implement the proposed work programmes over the recent past, and also during this current field season. This report is prepared by Chillex and documents work carried out by Chillex on EPM26740 during the reporting period 2 August 2021 to 1 August 2022. Exploration activities completed included: Further database interrogation and desktop research. On site reconnaissance and minor field work (when permissible). Collation of geophysical studies, data entry, programme revision.
GSQOpenData@dnrme.qld.gov.au - EPM 15619, PIONEER GOLD PROJECT, GAETA GOLD MINERAL FIELD, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 1/8/2013
공공데이터포털
URL: https://geoscience.data.qld.gov.au/dataset/cr079402 EPM 15619, PIONEER GOLD PROJECT, GAETA GOLD MINERAL FIELD, PARTIAL RELINQUISHMENT REPORT FOR PERIOD ENDING 1/8/2013