Shoalhaven City Council - Broughton Creek Floodplain Risk Management Study
Introduction Cardno were commissioned by Shoalhaven City Council to undertake the Floodplain Risk Management Study and Plan for the Broughton Creek catchment. The catchment is approximately 518 km2 in size and surrounds the township of Berry on the NSW south coast. The study has been undertaken to define the existing flooding behaviour and associated hazards, and to investigate possible mitigation options to reduce flood damage and risk. The tasks were undertaken alongside community consultations to ensure that community concerns were addressed. In the past, flooding in the catchment has caused property damage and posed a hazard to residents. Significant flood events occurred in 2011, 2005, 2002, 1988 and 1974. A flood study was previously prepared that identified the flood behaviour in the study area (SMEC, 2008). An update has subsequently been undertaken in this study to improve the definition of the flood behaviour in the Berry Township, and in the areas immediately adjacent to the township. Details on the update and outcomes of the study are provided in Appendix B through Appendix E. Flooding was assessed for the 50% AEP, 20% AEP, 10% AEP, 5% AEP, 2% AEP and 1% AEP events, as well as the Probable Maximum Flood (PMF). Flood levels, depths and velocities were determined, as well as provisional hazard categories, and hydraulic categories. From the base case results, a number of flood mitigation options were examined to manage flooding within the Broughton Creek catchment. The identification and examination of these options was done in accordance with the NSW Government Floodplain Development Manual (NSW Government, 2005).
데이터 정보
연관 데이터
Shoalhaven City Council - Kangaroo Valley Floodplain Risk Management Study
공공데이터포털
1 Introduction Cardno were commissioned by Shoalhaven City Council to undertake the Floodplain Risk Management Study and Plan for the Kangaroo Valley catchment. The study has been undertaken to define the existing flooding behaviour and associated hazards of the study area, and to investigate possible mitigation options to reduce flood damage and risk. The tasks were undertaken alongside community consultation to ensure that community concerns were addressed. This report details the flood damages assessment, the environmental, social and policy review, and the investigations undertaken into potential flood mitigation options. The findings of this report will be used to develop the Floodplain Risk Management Plan.
Shoalhaven City Council - Broughton Creek Floodplain Risk Management Plan
공공데이터포털
Introduction A Floodplain Risk Management Study (FRMS) and Floodplain Risk Management Plan (FRMP) for the Broughton Creek catchment has been prepared by Cardno for Shoalhaven City Council. The Study identifies and examines options for the management of flooding within the Broughton Creek catchment floodplain. This Plan takes the recommendations from the Study and incorporates them into a plan of implementation. Both studies have been prepared in accordance with the NSW Government Floodplain Development Manual (2005).
Shoalhaven City Council - Nowra and Browns Creeks Floodplain Risk Management Study
공공데이터포털
Cardno were commissioned by Shoalhaven City Council to undertake the Floodplain Risk Management Study and Plan for the Nowra and Browns Creeks catchment. The study has been undertaken to define the existing flooding behaviour and associated hazards of the study area, and to investigate possible mitigation options to reduce flood damage and risk. The tasks were undertaken alongside community consultation to ensure that community concerns were addressed. This report details the proposed implementation strategy for the flood risk management options identified in the Floodplain Risk Management Study (Cardno, 2015).
Shoalhaven City Council - Tabourie Lake Flood Study
공공데이터포털
INTRODUCTION The Tabourie Lake Flood Study has been prepared for Shoalhaven City Council (Council) to define the existing flood behaviour in the Tabourie Lake catchment and establish the basis for subsequent floodplain management activities. This project has been conducted under the State Assisted Floodplain Management Program and received State financial support.
Shoalhaven City Council - Burrill Lake Floodplain Risk Management Study and Plan
공공데이터포털
This report documents the Burrill Lake Floodplain Risk Management Study and Plan which investigates and presents a flood risk management strategy for the catchment. The study identifies the existing flooding characteristics and canvasses various measures to mitigate the effects of flooding. The end product is the Floodplain Management Plan, which describes how flood liable lands within the Burrill Lake catchment are to be managed in the future.
Shellharbour City Council - Elliot Lake - Little Lake Floodplain Risk Management Study
공공데이터포털
Executive Summary Cardno were commissioned by Shellharbour City Council to undertake the Floodplain Risk Management Study and Plan for the Elliot Lake – Little Lake catchment area. The Elliot Lake – Little Lake catchment lies south of Lake Illawarra in the Shellharbour LGA and drains to the Tasman Sea via Elliot Lake – Little Lake. The catchment covers approximately 12.4 km2 and includes the suburbs of Barrack Heights, Shellharbour, Flinders, Blackbutt and large parts of Mt Warrigal and Warilla. The majority of the catchment is urbanised with predominantly residential development and some business and light industry. Blackbutt Forest Reserve and the area upstream of the Princes Highway in the southern part of the catchment form the two main undeveloped areas. The main waterways of the catchment are Bensons Creek, Bensons Tributary and Tongarra Creek. Bensons Creek and Bensons Tributary drain the northern part of the study area, whilst Tongarra Creek drains the southern part. Both creeks drain into Elliot Lake – Little Lake which discharges to the Tasman Sea at Barrack Point. Most of these waterways are natural channels, except for:,
Shoalhaven City Council - Burrill Lake Catchment Flood Study
공공데이터포털
This report documents the Burrill Lake Catchment Flood Study which defines existing flood behaviour and establishes the basis for floodplain management activities in the future.
Shoalhaven City Council - Tabourie Lake FRMSP - Floodplain Risk Management Study - Report
공공데이터포털
Complete report
Central Coast Council - Turo Creek, Pretty Beach Floodplain Risk Management Study
공공데이터포털
This Floodplain Risk Management Study (FRMS) for Turo Creek, Pretty Beach, has been undertaken by Cardno Lawson Treloar for Gosford City Council to identify, assess and compare various options for the management of flood risk within the Turo Creek floodplain. The study has been undertaken in accordance with the NSW Government Floodplain Development Manual (2005). A locality plan can be found in Figure 1.1. The outline of the study area can be found in Figure 1.2. The report format follows the study methodology, which involved:,
Coffs Harbour City Council - Middle Creek Floodplain Risk Management Study and Plan (2021)
공공데이터포털
Middle Creek Floodplain Risk Management Study and Plan (2021)