데이터셋 상세
호주
Lake Macquarie City Council - Dora Creek Floodplain Risk Management Study and Plan - Report
Introduction The Dora Creek Flood Risk Management Plan has been prepared for Lake Macquarie City Council (Council) in accordance with the NSW Floodplain Development Manual (April 2005 - Reference 1) and the August 2010 Flood Risk Management Guide – Incorporating sea level rise benchmarks in flood risk assessment (Reference 4) and: Is based on a comprehensive and detailed evaluation of factors that affect and are affected by the use of flood prone land; Represents the considered opinion of the local community on how to best manage its flood risk and its flood prone land; and Provides a long-term path for the future development of the community. The Dora Creek catchment is located on the western side of Lake Macquarie waterway, 30 km south-west of Newcastle and 120 km north of Sydney. Dora Creek has a catchment area of approximately 238 km2 and is the largest catchment flowing into the Lake Macquarie waterway which has a total catchment of 648 km2 (Figure 1). The study area focuses on the existing township of Dora Creek and includes the townships of Cooranbong and Avondale, where new and planned rural and urban developments are proposed within the floodplain. The upper limit of the study area extends above Freemans Drive to Cooranbong and downstream to the confluence of Dora Creek with the Lake Macquarie waterway. There are three main tributaries within the catchment with Dora Creek being joined by Jigadee Creek at Cooranbong and then Stockton Creek before draining into Lake Macquarie waterway at Bonnells Bay and Lake Eraring. Watercourses within the catchment area and above the tidal limit are narrow; Dora Creek is typically less than 15 m wide upstream of Freemans Drive. Below the tidal limit, the creeks become broader with Dora Creek varying from a width of 50m at the Sydney to Newcastle Freeway to 100m where it forms a delta into Lake Macquarie waterway. Upstream of the delta the Eraring Power station draws cooling water for steam condensation from Bonnells Bay, which passes under Dora Creek through a concrete tunnel and open canal.
데이터 정보
연관 데이터
Lake Macquarie City Council - Cockle Creek - Floodplain Risk Management Plan October 2004
공공데이터포털
Summary of Management Plan (1) Most of the flood damage reduction measures considered as part of the 1993 Floodplain Management Study cannot be justified on benefit-cost considerations. They could be reconsidered if new information becomes available that leads to substantially increased benefit-cost ratios. Notwithstanding, Option 1E from the 1993 Floodplain Management Study was shown to have a Benefit-Cost ratio of about 0.4 and therefore should be retained within the Plan. This floodplain management strategy involved the voluntary raising of a 39 houses located in areas of Edgeworth, Barnsley and Boolaroo that are potentially flood affected. It is recommended that these houses be re-assessed and prioritised in terms of their suitability for house raising. Once a prioritised list has been determined, steps should be undertaken to implement the strategy. (2) The Flood and Floodplain Management Studies on which this Plan is based should be revisited. The reason for this and the process that should be followed is outlined in Appendix C. The majority of the floodplain management options considered in the 1993 study are either not viable from a cost/benefit perspective or may not be considered appropriate now. Hence, contemporary floodplain management issues need to be determined through consultation with the Committee and key stakeholders within the community. It is not clear whether any consultation took place as part of earlier studies. However, this is considered to be essential to managing future flooding issues that may arise along creek system and its floodplain. This could be achieved by distribution of a brochure similar to that included in Appendix A. (3) Development within areas defined in Figure 4 as 2A, 2B and 2C, should be able to proceed without extensive independent flood investigations, provided all appropriate requirements specified by the current Local Environment Plan are addressed (eg., those related to filling). (4) Development Restrictions Flooding/Tidal Inundation Certificates should be revised to incorporate the predicted peak level of the Probable Maximum Flood or an ‘extreme’ flood. The format of Development Restrictions Flooding/Tidal Inundation Certificates could be modified to provide more information. (5) Further investigations need to be undertaken to determine whether flood damage reduction measures can be implemented for those problem areas listed in Section 4.3.1 (6) Further hydraulic investigations should be undertaken the determine the amount of time before inundation of key areas along Cockle Creek in a typical major flood. (7) A flood liable lands DCP is to be developed specifically for the Cockle Creek catchment. The DCP would effectively serve as a revised Flood Policy and relate to the specifics of flood behaviour in the catchment (as distinct from the lake inundation flood behaviour that applies in other areas of Lake Macquarie City).
Lake Macquarie City Council - Lt Creek Floodplain Risk Management Study and Plan - Report
공공데이터포털
Main report
Lake Macquarie City Council - Lake Macquarie Waterway - Flood Risk Management Study & Plan
공공데이터포털
Flood Risk Management Study & Plan - Main report (Part 1 of 4) This Lake Macquarie Waterway Flood Risk Management Study and Plan constitutes a review of the second and third stage of the management process, namely the August 2000 Lake Macquarie Floodplain Management Study and the July 2001 Lake Macquarie Floodplain Management Plan. This review has been prepared by consultant WMAwater for Lake Macquarie City Council and was undertaken following a review of the 1998 Lake Macquarie Flood Study, to include the June 2007 long weekend storm/flood event and incorporation of the implications of climate change. The results of this Waterway Flood Risk Management Study and Plan Review will provide the basis for the future management of flood liable foreshores areas surrounding the Lake Macquarie waterway. The study concentrates on those areas of the foreshore within the boundaries of Lake Macquarie City Council, with no investigation of land within the Wyong local government area.
Lake Macquarie City Council - North Creek Warners Bay Flood Study January 2025 Final Report - All appendices & figures included
공공데이터포털
This document constitutes the first and second stages of the management process for the North Creek catchment. It presents a compilation of the data collected and has defined flood behaviour and flood risk for the catchment area. This study was commissioned under the 2005 NSW Floodplain Development Manual (Reference 1), however, it is recognised that the 2023 Flood Risk Management Manual (Reference 2) was gazetted shortly after the project commenced. While the study was undertaken in accordance with the 2005 manual, there are elements that are consistent to both the 2005 and 2023 manuals. Where appropriate, the 2023 manual is referenced where project methodology or outputs are consistent with the new 2023 manual
Lake Macquarie City Council - Lake Macquarie - Floodplain Management Plan August 2001
공공데이터포털
Floodplain Management Plan Report and figures. This Plan provides the basis for the future management of flood liable lands adjacent to the lake in the Lake Macquarie City Council area. The Plan was developed from the Lake Macquarie Flood Study (Part 1 - January 1998 and Part 2 - April 1998) and the Lake Macquarie Floodplain Management Study (August 2000). The Lake Macquarie Flood Study determined design flood levels for the 1%, 2% and 5% AEP floods and an Extreme flood event. It examined the still water level and also the effect of wave runup along the foreshore. The design events represent floods which have a certain probability of occurrence. The “1% AEP” or “1 in 100" flood has a 1 in 100 chance of being equalled or exceeded in any year. On a LONG TERM average it will happen once in every 100 years, but it is wrong to think it can only happen once in a century. Because floods are random events there is still a 1 in 100 chance of such a flood occurring next year no matter what happens this year.
Lake Macquarie City Council - Stony Creek Floodplain Risk Management Plan
공공데이터포털
This Floodplain Risk Management Study investigates what can be done to reduce or manage the effects of flooding in the catchment. The Floodplain Risk Management Plan recommends a mix of strategies to manage the risks of flooding. Using the merits-based approach advocated in the NSW State Government’s Floodplain Development Manual (2005) and in consultation with the community, Council and state agency stakeholders, a number of potential options for the management of flooding were identified. These options included: • flood modification measures; • property modification measures; and • emergency response measures. An extensive list of options was assessed against a range of criteria (technical, economic, environmental and social). Hydraulic modelling of some of the flood modification options was undertaken to provide a comprehensive analysis of those options that would involve significant capital expenditure.
Port Macquarie-Hastings Council - Wrights Creek Flood Study Update (2019)
공공데이터포털
This study updates the previous Wrights Creek Flood Study (Patterson Britton & Partners, 2007) and provides Council with a suitable platform for undertaking the next steps in the Floodplain Risk Management Process. The XP-RAFTS hydrologic model developed in the 2007 Flood Study has been adopted for this study. A TUFLOW hydraulic model of the catchment has been established using up to date survey of the ground levels and culvert and bridge structures. The TUFLOW hydraulic model has been used to reproduce the historical flood behaviour from events in 1995 and 2002 and to define flood behaviour for a range of design events. Actions undertaken as part of this flood study include: • collection of additional survey, • development of a TUFLOW hydraulic model, • definition of the design flood behaviour, • assessment of provisional hydraulic hazard, • assessment of hydraulic categorization, • assessment of the model sensitivity to parameter changes, • assessment of climate change impacts on model results, • assessment of sensitivity of model results to the new ARR 2016 design inputs, • community consultation.
Lake Macquarie City Council - Dora Creek Flood Study
공공데이터포털
The Dora Creek Flood Study 2015 updates the 1986 Dora Creek Flood Study. It was undertaken to update and extend the study area to include the townships of Dora Creek, Cooranbong and Avondale and to incorporate the implications of predicted climate change. The results provide the basis for future management of flood liable lands within the study area.
Lake Macquarie City Council - Stony Creek Floodplain Risk Management Study and Plan – Climate Change Assessment Discussion Paper
공공데이터포털
Includes figures and graphs
Port Macquarie-Hastings Council - North Brother Local Catchments Floodplain Risk Management Study and Plan - Report
공공데이터포털
Copy of full Floodplain Risk Management Study and Plan Report and appendices