Northern Beaches Council - Narrabeen Lagoon Flood Study Report
공공데이터포털
The Narrabeen Lagoon Flood Study has been prepared for Warringah and Pittwater Councils (The Councils) to define the existing flood behaviour in the Narrabeen Lagoon catchment and establish the basis for subsequent floodplain management activities. This study updates previous studies on the Lagoon including the Narrabeen Lagoon Flood Study (PWD, 1990) and studies of the individual tributary streams, providing a holistic assessment of flooding within the catchment. The current Flood Study considers land use changes subsequent to previous modelling investigations, the influence of the Narrabeen Lagoon entrance on flood behaviour and the influence of potential climate change. The primary objective of this Flood Study is to define the flood behaviour under historical, existing and future conditions (incorporating potential impacts of climate change) in the Narrabeen Lagoon catchment for a full range of design flood events. The study provides information on flood levels and depths, velocities, flows, hydraulic categories and provisional hazard categories. The Flood Study has also identified the impact on flood behaviour as a result of future climate change and potential changes in the catchment and lagoon entrance. Specifically, the study incorporates:,
Central Coast Council - Turo Creek, Pretty Beach Floodplain Risk Management Study
공공데이터포털
This Floodplain Risk Management Study (FRMS) for Turo Creek, Pretty Beach, has been undertaken by Cardno Lawson Treloar for Gosford City Council to identify, assess and compare various options for the management of flood risk within the Turo Creek floodplain. The study has been undertaken in accordance with the NSW Government Floodplain Development Manual (2005). A locality plan can be found in Figure 1.1. The outline of the study area can be found in Figure 1.2. The report format follows the study methodology, which involved:,
Lake Macquarie City Council - Stony Creek Floodplain Risk Management Plan
공공데이터포털
This Floodplain Risk Management Study investigates what can be done to reduce or manage the effects of flooding in the catchment. The Floodplain Risk Management Plan recommends a mix of strategies to manage the risks of flooding. Using the merits-based approach advocated in the NSW State Government’s Floodplain Development Manual (2005) and in consultation with the community, Council and state agency stakeholders, a number of potential options for the management of flooding were identified. These options included: • flood modification measures; • property modification measures; and • emergency response measures. An extensive list of options was assessed against a range of criteria (technical, economic, environmental and social). Hydraulic modelling of some of the flood modification options was undertaken to provide a comprehensive analysis of those options that would involve significant capital expenditure.
Bayside Council - Floodplain Management Study Spring Street Drain, Muddy Creek and Scarborough Ponds - Volume 1
공공데이터포털
Objective This Floodplain Management Study defines the nature and extent of the flood hazard in the three catchments. It also identifies and assesses strategies and measures aimed at reducing the impact of flooding on both existing and future development, and measures to prevent future development from making flooding worse. The results of this Floodplain Management Study are being used to prepare a Floodplain Management Plan (FPMP). The objective of the FPMP is to establish a cost-effective floodplain management strategy for the area and to recommend a programme for implementation of the Plan. The Study Brief is attached as Appendix A. What is in the Study The Floodplain Management Study and Plan will not totally eliminate flooding. Flooding is a natural phenomenon which cannot be fully controlled by human works. In fact, excessive artificial controls are likely to be very costly and to have adverse environmental effects. Therefore the Floodplain Management Study and Plan aim to provide a package of best management practices which give a balance between reducing flood hazard and flood damages, allowing appropriate development, and protecting and enhancing the environment of the floodplain. This Report has been divided into the following sections: Section 1: Introduction (page 1) Establishes the context and basis for the plan. Section 2: Background (page 5) Describes the study process, including previous studies, and the background technical information which is available. It includes a review of the previous Muddy Creek Flood Studies. Section 3: Existing Flood Behaviour (page 15) Summarises the available data and modelling results concerning flood behaviour. Section 4: Social and Economic Impacts of Flooding (page 23) Examines the potential flood damages and other social and economic effects of flooding for a range of flood events, including an extreme flood. Section 5: Choosing the Designated Flood (page 28) Discusses the issued to be considered by Council in choosing a designated flood for Rockdale, and recommends that the 1% AEP flood be adopted. Section 6: Available Floodplain Management Options (page 35) Describes in broad terms the range of flood mitigation and other management works and other measures available to address the existing, future and residual flooding problems in the study area. Sections 7, 8 and 9: Options for Management Areas (page 48) These three sections describe in detail, for the Muddy Creek, Spring St Drain and Scarborough Ponds catchments respectively, the feasible options and their likely benefits and costs. Section 10: Assessment of Management Options (page 86) Reviews the financial aspects and the justification for the proposed management measures, identifies priorities and possible sources of funding. These issues will be further addressed in the future Floodplain Management Plan. Section 11: References (page 90) Technical detail which supports the main report is provided in the Appendices, in Volume 2.