데이터셋 상세
호주
Narromine Shire Council - Narromine Floodplain Risk Management Study and Plan
Background Narromine Shire Council, through its Floodplain Management Committee is undertaking a Floodplain Risk Management Study and Plan for the town in accordance with the New South Wales Government's flood prone lands policy and using procedures set out in the Floodplain Development Manual, 2005. The results of the Study and the draft Plan are presented in this report. The Floodplain Risk Management Study used the data from the recent Narromine Flood Study (LACE, 2006) to undertake a review of the physical, social and economic aspects of flooding on the Macquarie River floodplain at Narromine in order to prepare the draft Floodplain Risk Management Plan. The Floodplain Risk Management Study summarised present day flooding conditions as determined by the LACE, 2006 investigation and identified and assessed potential measures aimed at reducing the impact of flooding on both existing and future development. This process allowed the formulation of a draft Floodplain Risk Management Plan for Narromine having regard to both existing flooding problems and to potential future development. Overview of Report The Floodplain Risk Management Study and draft Plan are set out in this report. Contents of each section of the report are briefly described below:,
데이터 정보
연관 데이터
Narromine Shire Council - Narromine Town Floodplain Risk Management Study And Plan Update - Reports
공공데이터포털
Narromine FRMS&P Update – Final Reports (Volume 1 and 2)
Narrabri Shire Council - Narrabri Flood Study Report
공공데이터포털
The Narrabri Flood Study constitutes the first stage of the Floodplain Risk Management process and assesses the risk of regional flooding from the Namoi River and local flooding from its tributaries, Mulgate Creek and Long Gully. It has been prepared by consultants WRM Water & Environment Pty Ltd and the Narrabri Shire Floodplain Risk Management Committee for Narrabri Shire Council.
Narromine Shire Council - Narromine Flood Study - Final Report
공공데이터포털
The activities comprising the present investigation included:,
Narromine Shire Council - Narromine Town Levee - Concept Design - Committee Meeting Presentation
공공데이터포털
Review of Narromine Flood Studies - Committee Meeting - 13 July 2017
Narrabri Shire Council - Narrabri Floodplain Risk Management Study and Plan - Reports
공공데이터포털
Final reports
Narromine Shire Council - Narromine Town Levee - Concept Design - Letter
공공데이터포털
Re: Funding under the 2012-13 Floodplain Manage Program - Narromine Levee Investigation - Stage 2 Grant Reference Number: 2012-13-FM-0249
Narrabri Shire Council - Boggabri Floodplain Risk Management Study and Plan - Reports
공공데이터포털
Final report
Narrandera Shire Council - Review of the Narrandera Floodplain Risk Management Study and Plan - Hydrological Model Files
공공데이터포털
Drains Hydrological Model Input and Output Files.
Narrabri Shire Council - Draft Narrabri Supplementary Floodplain Management Plan - Report
공공데이터포털
Complete report
Narromine Shire Council - Narromine Flood Behaviour Study (Draft) - Report
공공데이터포털
Complete report