데이터셋 상세
캐나다
Geophysical Series, NTS 115K/1, Airborne Geophysical Survey Southern Stevenson Ridge area, Yukon
A quantitative gamma-ray spectrometric and aeromagnetic helicopter-borne geophysical survey was completed by Fugro Airborne Surveys. The survey was flown from September 10 to October 14, 2008. The nominal traverse and control line spacings were 400m and 2400m respectively, and the aircraft flew at a nominal terrain clearance of 125m. Traverse lines were oriented at 0 degrees with orthogonal control lines.
연관 데이터
Geophysical Series, NTS 115J/4, Airborne Geophysical Survey Southern Stevenson Ridge area, Yukon
공공데이터포털
Quantitative gamma-ray spectrometric and aeromagnetic helicopter-borne geophysical survey was completed by Fugro Airborne Surveys. The survey was flown from September 10 to October 14, 2008. The nominal traverse and control line spacings were 400 m and 2400 m respectively, and the aircraft flew at a nominal terrain clearance of 125 m. Traverse lines were oriented at 0 degrees with orthogonal control lines.
Geophysical Series, NTS 115J/3, Airborne Geophysical Survey Southern Stevenson Ridge area, Yukon
공공데이터포털
Quantitative gamma-ray spectrometric and aeromagnetic helicopter-borne geophysical survey was completed by Fugro Airborne Surveys. The survey was flown from September 10 to October 14, 2008. The nominal traverse and control line spacings were 400 m and 2400 m respectively, and the aircraft flew at a nominal terrain clearance of 125 m. Traverse lines were oriented at 0 degrees with orthogonal control lines.
Multisensor airborne geophysical survey, Stewart River area, parts of 115N, 115O, 116B.
공공데이터포털
Data were acquired during an airborne geophysical survey (gamma ray spectrometer, magnetometer and VLF-EM) carried out by Fugro. Funding was provided by the Government of Yukon. The survey was completed between July 29 and September 21, 2000.
Multisensor airborne geophysical survey, Stewart River area, 115N, 115O, 116B (parts of)
공공데이터포털
Data were acquired during the second phase of an airborne geophysical survey (gamma ray spectrometer, magnetometer) carried out by Fugro. Funding was provided by Natural Resources Canada's Targeted Geoscience Initiative. The survey was completed between July 18 and September 28, 2001.
Airborne Geophysical Survey, Stewart River, Yukon Territory (Parts of 115N, O and 116B)
공공데이터포털
Results of multi-sensor (gamma ray spectrometer, magnetometer) contracted, helicopter surveys flown July-September, 2000 (phase 1) and July-September, 2001 (phase 2) are available in a variety of digital and printed formats. This is a joint release from the Geological Survey of Canada (GSC) and the Yukon Exploration and Geological Services Division (EGSD). Flight lines were positioned every 500 m. The survey was funded by the Geological Survey of Canada through the Targeted Geoscience Initiative. GSC Open File 4311, EGSD 2002-17D contains 120 digital images (in PDF format): 10 1:250,000 maps and 110 1:50,000 maps for 10 variables.
Geophysical Series, parts of NTS 115J/4, 115K/1, 115K/2, 115K/7, 115K/8, MEGATEM® II survey, Central Stevenson Ridge area, Yukon
공공데이터포털
The airborne survey was flown over the central Stevenson Ridge area. Flight line spacing is 400m in a 90-270 degree direction. Nominal terrain clearance of the EM receiver bird is 60m.
Geophysical Series, parts of NTS 115J/5, 115K/7, 115K/8, 115K/9, 115K/10, MEGATEM® II survey, Central Stevenson Ridge area, Yukon
공공데이터포털
The airborne survey was flown over the central Stevenson Ridge area. Flight line spacing is 400m in a 90-270 degree direction. Nominal terrain clearance of the EM receiver bird is 60m.
Multisensor airborne geophysical survey, Stewart River area, 115N/2
공공데이터포털
Data were acquired during an airborne geophysical survey (gamma ray spectrometer, magnetometer and VLF-EM) carried out by Fugro. Funding was provided by the Government of Yukon. The survey was completed between July 29 and September 21, 2000.
Multisensor airborne geophysical survey, Stewart River area, 115O/10
공공데이터포털
Data were acquired during the second phase of an airborne geophysical survey (gamma ray spectrometer, magnetometer) carried out by Fugro. Funding was provided by Natural Resources Canada's Targeted Geoscience Initiative. The survey was completed between July 18 and September 28, 2001.
Multisensor airborne geophysical survey, Stewart River area, 115O/6
공공데이터포털
Data were acquired during the second phase of an airborne geophysical survey (gamma ray spectrometer, magnetometer) carried out by Fugro. Funding was provided by Natural Resources Canada's Targeted Geoscience Initiative. The survey was completed between July 18 and September 28, 2001.