i19 Stormwater Permitees Municipal
공공데이터포털
The feature datasets contain Phase 1 and Phase 2 municipal separate stormwater sewer system (MS4s) permittees in California. These draft layers are based on 2010 census data and they have not been updated since 2013 and there are no current plans to include them as a SWRCB web service. Most of the Phase 1 permittees encompass an entire metropolitan area. The Municipal Storm Water Program manages the Phase I Permit Program (serving municipalities over 100,000 people), the Phase II Permit Program (for municipalities less than 100,000), and the Statewide Storm Water Permit for the State of California Department of Transportation. The State Water Resources Control Board (State Water Board) and Regional Water Quality Control Boards (collectively, the Water Boards) implement and enforce the Municipal Storm Water Program.
i19 Stormwater Capture Master Plan LosAngelesDWP Geophysical Polys
공공데이터포털
The feature dataset contains geophysical properties to analyze where obstacles to infiltration exist and where infiltration would be most desirable. Such properties include areas of mapped landslides or liquefaction potential, depth to groundwater, slope, hydrologic soil group, and geology (pervious or impervious). An aquifer classification system was also developed to guide prioritization. Each aquifer underlying Los Angeles was classified according to the ability of LADWP to pump the aquifer for use in LADWP’s distribution network. Each sub-basin in the LADWP model was assigned a Category A (High), B (Medium), or C (Low) depending on its combination of geophysical obstacles and opportunities and aquifer class. Areas categorized as “A” or “High” were those having the fewest hydrogeologic constraints (i.e. few obstacles to infiltration, highly infiltrative soils, permeable aquifers) and were overlying the highest priority aquifers. These would be most conducive to infiltration BMPs. Category “B” or “Medium” areas were somewhat geologically constrained and overlying mid-level priority aquifers. These areas were also considered suitable for infiltration BMPs. Category “C” or “Low” areas contain obstacles to infiltration and/or were overlying low-priority aquifers, making them more conducive to direct use BMPs.
i19 Stormwater Capture Master Plan LosAngelesDWP Geophysical Polys
공공데이터포털
The feature dataset contains geophysical properties to analyze where obstacles to infiltration exist and where infiltration would be most desirable. Such properties include areas of mapped landslides or liquefaction potential, depth to groundwater, slope, hydrologic soil group, and geology (pervious or impervious). An aquifer classification system was also developed to guide prioritization. Each aquifer underlying Los Angeles was classified according to the ability of LADWP to pump the aquifer for use in LADWP’s distribution network. Each sub-basin in the LADWP model was assigned a Category A (High), B (Medium), or C (Low) depending on its combination of geophysical obstacles and opportunities and aquifer class. Areas categorized as “A” or “High” were those having the fewest hydrogeologic constraints (i.e. few obstacles to infiltration, highly infiltrative soils, permeable aquifers) and were overlying the highest priority aquifers. These would be most conducive to infiltration BMPs. Category “B” or “Medium” areas were somewhat geologically constrained and overlying mid-level priority aquifers. These areas were also considered suitable for infiltration BMPs. Category “C” or “Low” areas contain obstacles to infiltration and/or were overlying low-priority aquifers, making them more conducive to direct use BMPs.
i17 StateWaterProject Centerline
공공데이터포털
This centerline has a multitude of potential uses for project tracking and spatial analysis. It is suitable for use as the base for a linear referencing system to record information about the State Water Project canal system, as a component of a hydrologic model, or simply as a cartographic element on both small and large scale maps. Canal centerlines were derived from the data in i17_StateWaterProject_Basemap. Pipeline and reservoir centerlines were copied from i17_StateWaterProject_Lines. The associated data are considered DWR enterprise GIS data, which meet all appropriate requirements of the DWR Spatial Data Standards, specifically the DWR Spatial Data Standard version 2.1, dated March 9, 2016. DWR makes no warranties or guarantees —either expressed or implied — as to the completeness, accuracy, or correctness of the data. DWR neither accepts nor assumes liability arising from or for any incorrect, incomplete, or misleading subject data.
NOTE: The IRWM polygons overlap each other. This polygon Feature Class includes IRWM planning regions participating in the State of California Department of Water Resources IRWM grant program. The data will be included as a component of the DWR Atlas of GIS data and be utilized as the feature data set for GIS projects requiring location of IRWM planning regions. This dataset is not to be utilized for survey purpose and is not designed to that accuracy level. Size of initial data set is 622 KB. Including additional attributes, the dataset is not expected to exceed 700 KB in size. Updates to this data will be once a year or as needed in conjunction with the IRWM Regional Boundaries dataset updates. Some IRWM Regions may decide not to participate in the grant program and will be in the attribute table with no spatial reference. An attribute called “Status” may be added to the feature class table. The data steward will be in charge of updating the dataset and responsible for any versioning. The associated data are considered DWR enterprise GIS data, which meet all appropriate requirements of the DWR GIS Spatial Data Standards. DWR makes no warranties or guarantees, either expressed or implied, as to the completeness, accuracy or correctness of the data, nor accepts or assumes any liability arising from or for any incorrect, incomplete or misleading subject data. Comments, problems improvements, updates or suggestions should be forwarded to the official GIS Data Steward as available and appropriate. The Region Acceptance Process (RAP) is a component of the Integrated Regional Water Management (IRWM) Program Guidelines and is used to evaluate and accept an IRWM region into the IRWM grant program. The RAP is not a grant funding application; however, acceptance of the composition of an IRWM region (including the IRWM region’s boundary) is required for DWR IRWM grant funding eligibility. This dataset includes:-the boundaries of the most current IRWM Regions (as submitted to DWR by the respective IRWM planning region)-their RAP status (Accepted or Conditional) as conferred by DWR the year each entity participated in the RAP-a descriptive field noting the date of any subsequent IRWM boundary changes submitted and accepted by DWR.