미국
Utah FORGE: Phase 1a Tensor Strainmeter Data for the April, 2022 Stimulation of Well 16A(78)-32
Data from two Tensor Optical Fiber Strainmeters that were operational during Stages 1, 2, and 3 of the April, 2022 stimulation of well 16A(78)-32. Each csv file contains data from each stimulation stage (stage1, stage2, stage3) for both Phase 1a strainmeter installations (FS01, formerly FS-C, and FS02, formerly FS1-2) in human-readable comma-separated value text files. There are two header lines in each file describing the data contained in that column along with their units, respectively. Data have been decimated from 2 to 1 Hz to match the Pason data found in the linked GDR dataset below (16A78-32 Stimulation Pason Data). These files contain the time series spanning the same time interval as the Pason data as well as ambient data for 5 hours before the stimulation and 5 hours following shut in. The station locations were chosen based on their proximity to the borehole seismometers owned and operated by the University of Utah. See README.txt for more information.