미국
Utah FORGE: Well 16A(78)-32 Stimulation Data (April, 2022)
This is a set of data related to the stimulation program at Utah FORGE well 16A(78)-32 during April, 2022. This includes daily reports, 1 second Pason data, tracer data, and shear stimulation data and information including a report of an evolving prognosis for the stimulation operations.