미국
Utah FORGE: Wells 16A(78)-32 and 16B(78)-32 Circulation Test Daily Reports from August 2024
These are the daily reports created during and around the August 2024 circulation test done on wells 16A(78)-32 and 16B(78)-32 at the Utah FORGE site. Information about the rig activity during this period includes details on rig up, depths, pumping, water temperature, safety, and cleanout. The reports span all rig activities from July 29th, 2024 through September 5th, 2024.