데이터셋 상세
미국
MTA LIRR Stop-Level Occupancy: Beginning January 2024
This dataset shows the customer occupancy as determined by loadweigh for each stop on each Long Island Rail Road revenue trip made by M7 and M9 trains.
데이터 정보