데이터셋 상세
미국
Performance Metrics - Transportation - Pavement Cave-ins
As underground drainage systems age, occasionally failures in the pipes and joints can cause pavement cave-ins. The Department of Transportation (CDOT) responds to pavement cave-ins reported through 311’s Customer Service Requests (CSR) system on a case-by-case basis. This metric tracks the average number of days CDOT takes to complete pavement cave-in repairs per week. The target response time for pavement cave-ins is within 3 days.
데이터 정보
연관 데이터
Performance Metrics - Transportation - Pothole Repair
공공데이터포털
When moisture seeps into pavement, it expands when it freezes and contracts when it thaws. This flexing of the pavement, combined with the melted water and the stress of vehicular traffic, causes pavement to deteriorate and potholes to form. The Department of Transportation (CDOT) responds to potholes reported through 311’s Customer Service Requests (CSR) system by mapping open pothole requests each morning and routing crews in geographic clusters so as to fill as many potholes as possible per day. This metric tracks the average number of days CDOT takes to complete pothole repairs per week. Total number of requests fulfilled per week is also available by mousing over columns. The target response time for pothole repairs is within 7 days. For more information about pothole repairs, see CDOT’s pothole Frequently Asked Questions page: http://www.cityofchicago.org/content/dam/city/depts/cdot/PotholeFAQ_winter1011.pdf
Performance Metrics - Streets & Sanitation - Rodent Baiting
공공데이터포털
In addition to performing regular scheduled preventative rodent control, the Department of Streets & Sanitation (DSS) responds to site-specific customer rat complaints logged through 311’s Customer Service Requests (CSR) system. This metric tracks the average number of days the DSS takes to complete rodent baiting requests per week. Median days to complete requests as well as total number of requests fulfilled per week are available by mousing over columns. The target response time for rodent baiting requests is within 7 days. For more information on open rat complaints, see https://data.cityofchicago.org/Government/311-Service-Requests-Rodent-Baiting-2011-/97t6-zrhs
Performance Metrics - Transportation - Traffic Lights Out
공공데이터포털
The Chicago Department of Transportation (CDOT) receives reports from 311’s Customer Service Requests (CSR) system of traffic light outages. This metric tracks the average number of days CDOT takes to complete traffic light repair requests. Total number of requests fulfilled per week is also available by mousing over columns Due to the public safety importance of traffic signals, the target time to respond to traffic light outages is within 1 day.
3.27 Traffic Delay Reduction (dashboard)
공공데이터포털
,
Capital District Transportation Authority (CDTA) Performance Metrics: Beginning 2009
공공데이터포털
CDTA is a public transportation authority in the Capital Region. This dataset presents information that reflects the organizations performance levels. This dataset includes customer boarding’s, miles operated, accidents, preventative maintenance inspections, and complaints.
3.36 Quality of City Services (dashboard)
공공데이터포털
This operations dashboard shows historic and current data related to this performance measure.,