데이터셋 상세
미국
Shapefile outlining the Lake Mohave shoreline
Lake Mohave is one of several multi-purpose reservoirs that have been constructed on the Colorado River. The lake was formed upon completion of the Davis Dam in 1953. No mapping of the floor of the lake had been conducted since completion of the Davis Dam. The U.S. Geological Survey, in cooperation with researchers from the University of Nevada Las Vegas, completed a geophysical survey of this lake in April 2002. The survey included collection of sidescan sonar imagery of nearly the entire lake floor, and high-resolution seismic-reflection profiles along widely spaced lines throughout the lake. The detailed mapping of the lake floor was used to determine the amount of sediment that had accumulated in the lake since impoundment, its distribution, and the processes of deposition.
데이터 정보
연관 데이터
Shapefile of the postimpoundment sediment limits in Lake Mead
공공데이터포털
Lake Mead is a large interstate reservoir located in the Mojave Desert of southeastern Nevada and northwestern Arizona. It was impounded in 1935 by the construction of Hoover Dam and is one of a series of multi-purpose reservoirs on the Colorado River. The lake extends 183 km from the mouth of the Grand Canyon to Black Canyon, the site of Hoover Dam, and provides water for residential, commercial, industrial, recreational, and other non-agricultural users in communities across the southwestern United States. Extensive research has been conducted on Lake Mead, but a majority of the studies have involved determining levels of anthropogenic contaminants such as synthetic organic compounds, heavy metals and dissolved ions, furans/dioxins, and nutrient loading in lake water, sediment, and biota (Preissler, et al., 1998; Bevans et al, 1996; Bevans et al., 1998; Covay and Leiker, 1998; LaBounty and Horn, 1997; Paulson, 1981). By contrast, little work has focused on the sediments in the lake and the processes of deposition (Gould, 1951). To address these questions, sidescan-sonar imagery and high-resolution seismic-reflection profiles were collected throughout Lake Mead by the USGS in cooperation with researchers from University of Nevada Las Vegas (UNLV). These data allow a detailed mapping of the surficial geology and the distribution and thickness of sediment that has accumulated in the lake since the completion of Hoover Dam. Results indicate that the accumulation of post-impoundment sediment is primarily restricted to former river and stream beds that are now submerged below the lake while the margins of the lake appear to be devoid of post-impoundment sediment. The sediment cover along the original Colorado River bed is continuous and is typically greater than 10 m thick through much of its length. Sediment thickness in some areas exceeds 35 m while the smaller tributary valleys typically are filled with less than 4 m of sediment. Away from the river beds that are now covered with post-impoundment sediment, pre-impoundment alluvial deposits and rock outcrops are still exposed on the lake floor.
Color shaded relief TIFF image of the area surrounding Lake Mohave: Geographic Coordinates
공공데이터포털
Lake Mohave is one of several multi-purpose reservoirs that have been constructed on the Colorado River. The lake was formed upon completion of the Davis Dam in 1953. No mapping of the floor of the lake had been conducted since completion of the Davis Dam. The U.S. Geological Survey, in cooperation with researchers from the University of Nevada Las Vegas, completed a geophysical survey of this lake in April 2002. The survey included collection of sidescan sonar imagery of nearly the entire lake floor, and high-resolution seismic-reflection profiles along widely spaced lines throughout the lake. The detailed mapping of the lake floor was used to determine the amount of sediment that had accumulated in the lake since impoundment, its distribution, and the processes of deposition.
Interpretation of the Sidescan-sonar Imagery in Lake Mohave
공공데이터포털
Lake Mohave is one of several multi-purpose reservoirs that have been constructed on the Colorado River. The lake was formed upon completion of the Davis Dam in 1953. No mapping of the floor of the lake had been conducted since completion of the Davis Dam. The U.S. Geological Survey, in cooperation with researchers from the University of Nevada Las Vegas, completed a geophysical survey of this lake in April 2002. The survey included collection of sidescan sonar imagery of nearly the entire lake floor, and high-resolution seismic-reflection profiles along widely spaced lines throughout the lake. The detailed mapping of the lake floor was used to determine the amount of sediment that had accumulated in the lake since impoundment, its distribution, and the processes of deposition.
Sidescan-sonar Tracklines in Geographic Coordinates from Lake Mohave - 2002
공공데이터포털
Lake Mohave is one of several multi-purpose reservoirs that have been constructed on the Colorado River. The lake was formed upon completion of the Davis Dam in 1953. No mapping of the floor of the lake had been conducted since completion of the Davis Dam. The U.S. Geological Survey, in cooperation with researchers from the University of Nevada Las Vegas, completed a geophysical survey of this lake in April 2002. The survey included collection of sidescan sonar imagery of nearly the entire lake floor, and high-resolution seismic-reflection profiles along widely spaced lines throughout the lake. The detailed mapping of the lake floor was used to determine the amount of sediment that had accumulated in the lake since impoundment, its distribution, and the processes of deposition.
JPEG Images of seismic-reflection profiles collected in Lake Mohave in 2002
공공데이터포털
Lake Mohave is one of several multi-purpose reservoirs that have been constructed on the Colorado River. The lake was formed upon completion of the Davis Dam in 1953. No mapping of the floor of the lake had been conducted since completion of the Davis Dam. The U.S. Geological Survey, in cooperation with researchers from the University of Nevada Las Vegas, completed a geophysical survey of this lake in April 2002. The survey included collection of sidescan sonar imagery of nearly the entire lake floor, and high-resolution seismic-reflection profiles along widely spaced lines throughout the lake. The detailed mapping of the lake floor was used to determine the amount of sediment that had accumulated in the lake since impoundment, its distribution, and the processes of deposition.
TIFF Sidescan-Sonar mosaic of Lake Mohave : UTM, Zone 11, NAD83 Projection
공공데이터포털
Lake Mohave is one of several multi-purpose reservoirs that have been constructed on the Colorado River. The lake was formed upon completion of the Davis Dam in 1953. No mapping of the floor of the lake had been conducted since completion of the Davis Dam. The U.S. Geological Survey, in cooperation with researchers from the University of Nevada Las Vegas, completed a geophysical survey of this lake in April 2002. The survey included collection of sidescan sonar imagery of nearly the entire lake floor, and high-resolution seismic-reflection profiles along widely spaced lines throughout the lake. The detailed mapping of the lake floor was used to determine the amount of sediment that had accumulated in the lake since impoundment, its distribution, and the processes of deposition.
Isopach Map of Postimpoundment Sediment in Lake Mead - Geographic Coordinates
공공데이터포털
Lake Mead is a large interstate reservoir located in the Mojave Desert of southeastern Nevada and northwestern Arizona. It was impounded in 1935 by the construction of Hoover Dam and is one of a series of multi-purpose reservoirs on the Colorado River. The lake extends 183 km from the mouth of the Grand Canyon to Black Canyon, the site of Hoover Dam, and provides water for residential, commercial, industrial, recreational, and other non-agricultural users in communities across the southwestern United States. Extensive research has been conducted on Lake Mead, but a majority of the studies have involved determining levels of anthropogenic contaminants such as synthetic organic compounds, heavy metals and dissolved ions, furans/dioxins, and nutrient loading in lake water, sediment, and biota (Preissler, et al., 1998; Bevans et al, 1996; Bevans et al., 1998; Covay and Leiker, 1998; LaBounty and Horn, 1997; Paulson, 1981). By contrast, little work has focused on the sediments in the lake and the processes of deposition (Gould, 1951). To address these questions, sidescan-sonar imagery and high-resolution seismic-reflection profiles were collected throughout Lake Mead by the USGS in cooperation with researchers from University of Nevada Las Vegas (UNLV). These data allow a detailed mapping of the surficial geology and the distribution and thickness of sediment that has accumulated in the lake since the completion of Hoover Dam. Results indicate that the accumulation of post-impoundment sediment is primarily restricted to former river and stream beds that are now submerged below the lake while the margins of the lake appear to be devoid of post-impoundment sediment. The sediment cover along the original Colorado River bed is continuous and is typically greater than 10 m thick through much of its length. Sediment thickness in some areas exceeds 35 m while the smaller tributary valleys typically are filled with less than 4 m of sediment. Away from the river beds that are now covered with post-impoundment sediment, pre-impoundment alluvial deposits and rock outcrops are still exposed on the lake floor.
Point Shapefile indicating John Day Reservoir bottom photographs locations - 2000
공공데이터포털
A two-week field operation was conducted in the John Day Reservoir on the Columbia River to image the floor of the pool, to measure the distribution and thickness of post-impoundment sediment, and to verify these geophysical data with video photography and bottom sediment samples. The field program was a cooperative effort between the USGS Coastal and Marine Geology Team of the Geologic Division and the USGS Columbia River Research Laboratory of the Biological Resources Division. The data collection was completed aboard the R/V ESTERO during September 13-27, 2000. The interest in sediment accumulation in the reservoir was two-fold. First, it was unknown how effective this reservoir was as a sediment trap to material that otherwise would have been transported down-river to the estuary and eventually to the ocean. The recent erosion of beaches along the Washington coast has been attributed to a decreased contribution of sediment from the Columbia River to the coastal system due to the damming of the river. Second, sediment accumulation on the floors of reservoirs along the Columbia River has been suggested to be diminishing salmon spawning grounds. The extent of changes in habitat since construction of the John Day Dam, however, had not been documented. Common data sets were needed to address both of these questions, and for these reasons this geophysical and sampling program was undertaken.
Surface Representing the Floor of Lake Mead and the surrounding area: UTM Projection 10m cellsize
공공데이터포털
Lake Mead is a large interstate reservoir located in the Mojave Desert of southeastern Nevada and northwestern Arizona. It was impounded in 1935 by the construction of Hoover Dam and is one of a series of multi-purpose reservoirs on the Colorado River. The lake extends 183 km from the mouth of the Grand Canyon to Black Canyon, the site of Hoover Dam, and provides water for residential, commercial, industrial, recreational, and other non-agricultural users in communities across the southwestern United States. Extensive research has been conducted on Lake Mead, but a majority of the studies have involved determining levels of anthropogenic contaminants such as synthetic organic compounds, heavy metals and dissolved ions, furans/dioxins, and nutrient loading in lake water, sediment, and biota (Preissler, et al., 1998; Bevans et al, 1996; Bevans et al., 1998; Covay and Leiker, 1998; LaBounty and Horn, 1997; Paulson, 1981). By contrast, little work has focused on the sediments in the lake and the processes of deposition (Gould, 1951). To address these questions, sidescan-sonar imagery and high-resolution seismic-reflection profiles were collected throughout Lake Mead by the USGS in cooperation with researchers from University of Nevada Las Vegas (UNLV). These data allow a detailed mapping of the surficial geology and the distribution and thickness of sediment that has accumulated in the lake since the completion of Hoover Dam. Results indicate that the accumulation of post-impoundment sediment is primarily restricted to former river and stream beds that are now submerged below the lake while the margins of the lake appear to be devoid of post-impoundment sediment. The sediment cover along the original Colorado River bed is continuous and is typically greater than 10 m thick through much of its length. Sediment thickness in some areas exceeds 35 m while the smaller tributary valleys typically are filled with less than 4 m of sediment. Away from the river beds that are now covered with post-impoundment sediment, pre-impoundment alluvial deposits and rock outcrops are still exposed on the lake floor.
Reformatted Navigation from Lake Mead - 1999
공공데이터포털
Lake Mead is a large interstate reservoir located in the Mojave Desert of southeastern Nevada and northwestern Arizona. It was impounded in 1935 by the construction of Hoover Dam and is one of a series of multi-purpose reservoirs on the Colorado River. The lake extends 183 km from the mouth of the Grand Canyon to Black Canyon, the site of Hoover Dam, and provides water for residential, commercial, industrial, recreational, and other non-agricultural users in communities across the southwestern United States. Extensive research has been conducted on Lake Mead, but a majority of the studies have involved determining levels of anthropogenic contaminants such as synthetic organic compounds, heavy metals and dissolved ions, furans/dioxins, and nutrient loading in lake water, sediment, and biota (Preissler, et al., 1998; Bevans et al, 1996; Bevans et al., 1998; Covay and Leiker, 1998; LaBounty and Horn, 1997; Paulson, 1981). By contrast, little work has focused on the sediments in the lake and the processes of deposition (Gould, 1951). To address these questions, sidescan-sonar imagery and high-resolution seismic-reflection profiles were collected throughout Lake Mead by the USGS in cooperation with researchers from University of Nevada Las Vegas (UNLV). These data allow a detailed mapping of the surficial geology and the distribution and thickness of sediment that has accumulated in the lake since the completion of Hoover Dam. Results indicate that the accumulation of post-impoundment sediment is primarily restricted to former river and stream beds that are now submerged below the lake while the margins of the lake appear to be devoid of post-impoundment sediment. The sediment cover along the original Colorado River bed is continuous and is typically greater than 10 m thick through much of its length. Sediment thickness in some areas exceeds 35 m while the smaller tributary valleys typically are filled with less than 4 m of sediment. Away from the river beds that are now covered with post-impoundment sediment, pre-impoundment alluvial deposits and rock outcrops are still exposed on the lake floor.