Utah FORGE: Sanvean Technologies Drilling Data from Well 16B(78)-32
공공데이터포털
Included here is Sanvean Technologies bit sensor data amalgamated with data from National Oilwell Varco's (NOV) BlackBox tool for Reed Hycalog bits used during drilling of Well 16B(78)-32. The dataset contains information collected at the bit while drilling including rate of penetration (ROP), top drive torque, and bit box temperature. The data was recorded at the bit box and top sub of the motor. RPM was measured by onboard gyro recording continuously in each sensor, and shock levels were also recorded on X, Y and Z axis. This data was merged with EDR in time format and saved in file sets (the zipped files) then output into CSV files. Please note: fields in the CSV files, such as the date field, may need to be formatted to display properly. There is an additional zipped folder in each dataset that is password protected. Sanvean GameChanger Viewer software must be used to view this password protected data. Information on how to use and download this free software is also included here.
Utah FORGE: Well 16A(78)-32: Summary of Drilling Activities
공공데이터포털
This is a 74 page detailed summary of the drilling activities of Utah FORGE 16A(78)-32, a highly deviated well completed on February 2nd, 2021, as part of the Utah FORGE project. This well was deviated at 65 degrees from vertical after reaching 6000 feet in depth had a total measured depth of 10,987 feet. The report summarizes the operations, lessons learned, and recommendations for each drilled section of the well.
Utah FORGE: Well 16A(78)-32: Summary of Drilling Activities
공공데이터포털
This is a 74 page detailed summary of the drilling activities of Utah FORGE 16A(78)-32, a highly deviated well completed on February 2nd, 2021, as part of the Utah FORGE project. This well was deviated at 65 degrees from vertical after reaching 6000 feet in depth had a total measured depth of 10,987 feet. The report summarizes the operations, lessons learned, and recommendations for each drilled section of the well.
Utah FORGE: Well 16B(78)-32 Drilling Data
공공데이터포털
This drilling data for Utah FORGE well 16B(78)-32 include a well survey, core summary, mud and mud temperature logs, daily reports of the drilling process, and additional data from the Pason oil and gas company. Well 16B(78)-32 serves as the production well for reservoir creation, fluid circulation, and demonstration of heat extraction for the FORGE project. It has been drilled as a doublet approximately 300 feet parallel to and above the injection well 16A(78)-32. The proposed total depth was 10,658 feet, which was exceeded. Spudding began on April 26th, 2023. As of June 20th, 2023, the total depth measured 10,947 feet and the vertical depth measured 8,357 feet. Drilling included the trial use of insulated drill pipe (IDP) from Eavor Technologies, which was considered a success. IDP restricts counter-current heat transfer between drilling fluid inside the drill string and hotter returning fluid in the annulus, thereby ensuring the bottomhole assembly (BHA) remains submerged in cool fluid. Eavor rented 350 joints of IDP to FORGE which were run in two consecutive BHAs at the well. The results of this trial are included here.
Utah FORGE: Well 16B(78)-32 Drilling Data
공공데이터포털
This drilling data for Utah FORGE well 16B(78)-32 include a well survey, core summary, mud and mud temperature logs, daily reports of the drilling process, and additional data from the Pason oil and gas company. Well 16B(78)-32 serves as the production well for reservoir creation, fluid circulation, and demonstration of heat extraction for the FORGE project. It has been drilled as a doublet approximately 300 feet parallel to and above the injection well 16A(78)-32. The proposed total depth was 10,658 feet, which was exceeded. Spudding began on April 26th, 2023. As of June 20th, 2023, the total depth measured 10,947 feet and the vertical depth measured 8,357 feet. Drilling included the trial use of insulated drill pipe (IDP) from Eavor Technologies, which was considered a success. IDP restricts counter-current heat transfer between drilling fluid inside the drill string and hotter returning fluid in the annulus, thereby ensuring the bottomhole assembly (BHA) remains submerged in cool fluid. Eavor rented 350 joints of IDP to FORGE which were run in two consecutive BHAs at the well. The results of this trial are included here.
Utah FORGE: Well 16A(78)-32 Drilling Data
공공데이터포털
This dataset includes survey data, drilling data, daily reports, summaries of daily operations, and rig photos from the drilling of Utah FORGE well 16A(78)-32, which is a highly deviated deep well. It was completed 60 days ahead of schedule. Rig move in began 10/22/2020 and drilling commenced on 10/30/2020, and total depth was reached on 12/18/2020. Drilling was followed by a diagnostic fracture injection test (DFIT), logging, and circulating casing. The rig was released on 1/12/2021. The upper part of the well was drilled vertically through approximately 4,700 feet of sediments before penetrating into high strength, crystalline granite. The well was deviated at a 65 degree angle from vertical after reaching a depth of 6,000 ft. This angle was maintained for the remainder of the well's trajectory. The well ultimately reached a true vertical depth of 8,559 feet, and a total measured depth of 10,987 feet. Preliminary measurements indicate temperatures at the "toe" of the well will exceed 442 degrees F (228 degrees C). Approximately 74 ft of core of the granitic and metamorphic rocks that will form the FORGE reservoir was also recovered.
Utah FORGE: Well 16A(78)-32 Drilling Data
공공데이터포털
This dataset includes survey data, drilling data, daily reports, summaries of daily operations, and rig photos from the drilling of Utah FORGE well 16A(78)-32, which is a highly deviated deep well. It was completed 60 days ahead of schedule. Rig move in began 10/22/2020 and drilling commenced on 10/30/2020, and total depth was reached on 12/18/2020. Drilling was followed by a diagnostic fracture injection test (DFIT), logging, and circulating casing. The rig was released on 1/12/2021. The upper part of the well was drilled vertically through approximately 4,700 feet of sediments before penetrating into high strength, crystalline granite. The well was deviated at a 65 degree angle from vertical after reaching a depth of 6,000 ft. This angle was maintained for the remainder of the well's trajectory. The well ultimately reached a true vertical depth of 8,559 feet, and a total measured depth of 10,987 feet. Preliminary measurements indicate temperatures at the "toe" of the well will exceed 442 degrees F (228 degrees C). Approximately 74 ft of core of the granitic and metamorphic rocks that will form the FORGE reservoir was also recovered.
Utah FORGE: Well 56-32 Drilling Data and Logs
공공데이터포털
This dataset consists of drilling data (Pason data spreadsheets, daily reports, days v. depth, mud logs), Schlumberger logs (FMI, shear anisotropy analysis, memory, sonic, array induction/spectral density/dual spaced neutron/gamma ray/caliper, spectral GR/temperature, and Gardner density correlation), and an end of well report (EOWR) for Utah FORGE well 56-32. This is a vertical well that will be used for seismic monitoring. It was drilled between February 7th and February 21st 2021 to a depth of 9,145 feet. More information about this well can be found at: https://utahforge.com/2021/02/09/drilling-progress-of-well-56-32/ (linked below)